User's Manual

Installation
3A2894F 23
3. Install the Boom Base onto
the Machine Base.
Slide the boom base into the machine base mast.
4. Assemble the Hose Clamps
onto the Front Boom Arm.
Hand tighten all hose clamps.
NOTE: Refer to steps 8 and 10 for visual clarity of hose
clamp placement.
5. Install the Front Boom Arm
onto the Boom Base.
Torque all fasteners to 24 ft-lb (33 N•m).
6. Install the Fluid Plate onto the
Front Boom Arm.
a. Torque the fluid plate fasteners to 24 ft-lb
(33 N•m).
b. Install the fluid regulators if removed for installa-
tion.
Calibration check only
Resin Hose Clamp
NOTICE
Injury may occur if the fluid plate is lifted by only one
person. Use a hoist, multiple people, or remove the
fluid regulators prior to installation.
(3) Places