User's Manual

Installation
24 3A2894F
7. Calibration Check Only:
Install the Calibration Check
Assembly and Material Tubes
onto the Boom Assembly.
a. Tighten all fittings to prevent leaking.
b. Tighten all hose clamps to secure material lines.
NOTE: For additional assembly details, refer to the
ExactaBlend AGP Advanced Glazing Proportioner -
Accessories, Instructions manual.
8. Route and Connect the
Base (A) Material Hoses.
a. Tighten all fittings to prevent leaking.
b. Tighten all hose clamps to secure material lines.
S100 Shown