User's Manual

Installation
3A2894F 25
9. P100 Only: Install the Dosing
Valve.
a. Tighten all fittings to prevent leaking.
b. Install the air supply from the catalyst integrated
air controls.
c. Connect the solenoid cable from port “3” of the
FCM. Refer to Fluid Control Module (FCM),
page 20. Allow enough length for lifting the ram
out of material container.
Label “100”