User's Manual

Installation
3A2894F 31
16.Ultra-lite Tri-core Only:
Replace the Relief Valve on
Both Integrated Air Controls.
Replace the standard relief valve found on both the
base (A) and catalyst (B) integrated air controls with the
relief valve for the Ultra-lite Tri-core dispense valve.
17.U100 Models Only: Locate
and Connect the Pressure
Pot
a. Locate the pressure pot on the machine base.
b. Connect the chemical line from the pressure pot
to the fluid filter inlet using fitting provided.
c. Connect the air line from the Base (A) Inte-
grated Air Controls to the pressure pot.
U100 Shown
S100 Shown