User's Manual

Setup
3A2894F 35
h. Activate on the DM.
i. Open the base (A) air motor slider valve.
j. Increase the base (A) air motor regulator as
required to have material flow out of the hose.
k. Dispense the material into the waste container
until the base (A) material hose is purged and
free of air.
l. Deactivate on the DM.
m. Close the base (A) air motor slider valve.
n. Repeat steps a through m for the catalyst (B)
hose. Refer to Integrated Air Controls,
page 18, for visual clarity.
NOTE: Activate on the DM when prompted and all
slider valves refer to the catalyst (B) air controls.