User's Manual

Setup
36 3A2894F
2. Connect the dispense appli-
cator.
MD2:
a. Connect both base (A) and catalyst (B) material
hoses to the dispense applicator.
b. Activate both and on the DM.
c. Open the catalyst (B) ball valve and dispense
material into a waste container until the dis-
pense valve has been purged and is free of air.
d. Activate on the DM.
Ultra-lite:
a. Connect the base (A) hose to the base (A) inlet
fitting.
b. Connect the catalyst (B) hose to the catalyst (B)
inlet fitting.
c. Open the catalyst (B) ball valve and dispense
material into a waste container until the dis-
pense valve has been purged and is free of air.
d. Close the catalyst (B) ball valve and dispense
material into a waste container until only
base (A) is present.