User's Manual

Startup
3A2894F 43
6. Verify the base (A) and catalyst (B) air motor regula-
tors are set to the correct pressure.
MD2 or Ultra-lite with flexible hose:
70 psi (480 kPa, 4.8 bar).
Ultra-lite with Tri-core:
85 psi (586 kPa, 5.9 bar)
7. P100 with Ultra-Lite Tri-core Mixer: Verify that the
85 psi (5.9 bar) option box is selected. Refer to
Screen 1, page 66.
8. Verify the ram director valve is set to lower the ram.
9. The DM will show a standby screen when power is
first supplied to the machine. Press to go to
the Home screen.
NOTE: The Home screen will indicate “Not OK” and the
light tower, if installed, will illuminate red until the next
step is completed.
10. Disengage the trigger lock.
NOTE: If a new static mixer has been installed, a base
purge is recommended to prevent side walling. Perform
Base Purge, page 44.
11. Hold a metal part of the gun firmly to a grounded
metal pail. Trigger the gun until the Display Module
shows “OK” and the light tower, if installed, illumi-
nates green.
NOTE: Additional dispensing may be required in order
to ensure a good mixture.
r_255179_purge