User's Manual

Shutdown
48 3A2894F
e. Close the calibration check assembly.
f. Clean the nozzles of the calibration check
assembly and install the JIC caps.
g. Close the base (A) and catalyst (B) main air
slider valves.
h. If electrical power is not supplied to the
machine, place a waste container underneath
the pump bleed valves. Open the pump bleed
valves. Clean the pump bleed valves once com-
plete.
NOTE: For U100 systems, the catalyst bleed valve is
located on the pump outlet filter.
Shutdown
1. Perform Pressure Relief Procedure, page 46.
2. Turn the power off at the electrical enclosure.