User Manual

2. Install swing mast on boom head and connect
auxiliary hydraulic hoses to swing mast diversion
valve hoses. Also connect electrical cable at boom
head.
5. Inspect supporting surface at delivery point and
have it leveled if necessary.
6. Level handler before raising load.
7. If necessary, perform a “dry-run” (unloaded) of
delivery to determine best position for handler.
8. Use a signal man to assist in positioning the load if
necessary.
Observe all precautions and load capacity
limits (listed previously) when handling load
with swing mast.
3. Always lower carriage fully in mast and position
forks straight ahead before engaging load.
4. To travel with a load, keep forks straight ahead
and lower load to approximately one foot above
ground.
MULTI-FUNCTION AUXILIARY CONTROL LEVER
AUXILIARY CONTROLS
BUTTON
FUNCTIONS
1. MAST
2. SIDE
SHIFT
3. SWING
4. PANEL
SUPPORT
5. -----------
DECAL FOR PANEL HANDLER
If your unit is equipped with a multi-function
auxiliary control lever, it is not necessary to
depress button/s for single function attach-
ments.
30
LEVER
OPERATION
LEFT/DOWN
RIGHT/UP