2'-18' Diameter Bins Cor-Lok and Cut-Lok Flooring and Grandstand Layout Installation Manual PNEG-214 Date: 03-07-08 PNEG-214
PNEG-214 12'-18' Cor-Lok and Cut-Lok Flooring
Table of Contents Contents Chapter 1 Safety .................................................................................................................................................. 5 Safety Guidelines ................................................................................................................................ 5 Safety Instructions ...............................................................................................................................
Table of Contents Chapter 11 20 Gauge Floor Support Requirements ....................................................................................... 27 20 Gauge Grandstand Chart - 2.66" Corrugation ............................................................................ 27 20 Gauge Grandstand Chart - 4.00" Corrugation ............................................................................ 28 Chapter 12 Flashing Support Stiffeners ................................................................
1. Safety Safety Guidelines This manual contains information that is important for you, the owner/operator, to know and understand. This information relates to protecting personal safety and preventing equipment problems. It is the responsibility of the owner/operator to inform anyone operating or working in the area of this equipment of these safety guidelines. To help you recognize this information, we use the symbols that are defined below. Please read the manual and pay attention to these sections.
1. Safety Safety Instructions Our foremost concern is your safety and the safety of others associated with this equipment. We want to keep you as a customer. This manual is to help you understand safe operating procedures and some problems which may be encountered by the operator and other personnel. As owner and/or operator, it is your responsibility to know what requirements, hazards and precautions exist, and to inform all personnel associated with the equipment or in the area.
1. Safety Prepare for Emergencies Be prepared if fire starts. Keep a first aid kit and fire extinguisher handy. Keep emergency numbers for doctors, ambulance service, hospital and fire department near your telephone. Keep Emergency Equipment Quickly Accessible Wear Protective Clothing Wear close fitting clothing and safety equipment appropriate to the job. Eye Protection Remove all jewelry. Long hair should be tied up and back.
2. Recommended Method for Full Floor Installation Fan Placement Diagram For uniform air flow, place the fans in relation to the unloading tube as shown in Figure 2A. Floor planks should be perpendicular to the unloading tube.
2. Recommended Method for Full Floor Installation Grain Systems Recommended Method for Full Floor Installation Using the GSI recommended method for full floor installation should save construction time and eliminate the problem of improper installation which could invalidate your warranty. Note the following dimensions as shown in Figure 2B. • • • Dimension “A” is the leg-to-leg spacing along the centerline of a given plank.
2. Recommended Method for Full Floor Installation IMPORTANT: First piece of flooring must start at the proper distance from centerline of bin. Refer to floor layout on Page 14. First piece may need to be trimmed for length to fit at the proper location. Figure 2C 4. Install flooring starting at the bin wall on the opposite side of the unload auger. Floor planks should be placed perpendicular to the unload auger with the outside edge the correct distance from the center of the bin.
3.
4. Flashing Installation Figure 4A Grain Systems Formed Flashing Installation If a bin sweep auger will be used, overlap flashing so that the sweep with climb up on to the next flashing section when rotating (usually clockwise). (See Figure 4A.) This will prevent the rotating/slipping outer wheel of the sweep from catching on the flashing edges. (All GSI power sweeps and carry-in sweeps manufactured after April 2002 run clockwise.
Support all center wells to concrete. 5.
Support all center wells to concrete. 6.
PNEG-214 12'-18' Cor-Lok and Cut-Lok Flooring IMPORTANT: First piece of flooring must start at the proper distance from center of bin. First few pieces may have to be trimmed for proper fit. NOTE: Every other row to be staggered. Unsupported ends of floor pieces not to exceed 9 inches. * 2 Supports per tank were added for center well. (See center well grandstand layout on Page 13.) Support all center wells to concrete. 6.
7. 15' Cor-Lok/Cut-Lok Plank Order and Grandstand Layouts Support all center wells to concrete.
PNEG-214 12'-18' Cor-Lok and Cut-Lok Flooring IMPORTANT: First piece of flooring must start at the proper distance from center of bin. First few pieces may have to be trimmed for proper fit. NOTE: Every other row to be staggered. Unsupported ends of floor pieces not to exceed 9 inches. * 2 Supports per tank were added for center well. (See center well grandstand layout on Page 13.) Support all center wells to concrete. 7.
IMPORTANT: First piece of flooring must start at the proper distance from center of bin. First few pieces may have to be trimmed for proper fit. NOTE: Every other row to be staggered. Unsupported ends of floor pieces not to exceed 9 inches. * 2 Supports per tank were added for center well. (See center well grandstand layout on Page 13.) Support all center wells to concrete. 7. 15' Cor-Lok/Cut-Lok Plank Order and Grandstand Layouts 15' Cor-Lok/Cut-Lok and 20 Gauge Grandstand Layout 2.
PNEG-214 12'-18' Cor-Lok and Cut-Lok Flooring IMPORTANT: First piece of flooring must start at the proper distance from center of bin. First few pieces may have to be trimmed for proper fit. NOTE: Every other row to be staggered. Unsupported ends of floor pieces not to exceed 9 inches. * 2 Supports per tank were added for center well. (See center well grandstand layout on Page 13.) Support all center wells to concrete. 7.
Support all center wells to concrete. 8.
PNEG-214 12'-18' Cor-Lok and Cut-Lok Flooring IMPORTANT: First piece of flooring must start at the proper distance from center of bin. First few pieces may have to be trimmed for proper fit. NOTE: Every other row to be staggered. Unsupported ends of floor pieces not to exceed 6 inches. * 2 Supports per tank were added for center well. (See center well grandstand layout on Page 13.) Support all center wells to concrete. 9.
IMPORTANT: First piece of flooring must start at the proper distance from center of bin. First few pieces may have to be trimmed for proper fit. NOTE: Every other row to be staggered. Unsupported ends of floor pieces not to exceed 9 inches. * 2 Supports per tank were added for center well. (See center well grandstand layout on Page 13.) Support all center wells to concrete. 10. 18' Cut-Lok/Cor-Lok and Grandstand Layouts 18' Cor-Lok/Cut-Lok and 20 Gauge Grandstand Layout 2.
PNEG-214 12'-18' Cor-Lok and Cut-Lok Flooring IMPORTANT: First piece of flooring must start at the proper distance from center of bin. First few pieces may have to be trimmed for proper fit. NOTE: Every other row to be staggered. Unsupported ends of floor pieces not to exceed 8 inches. * 2 Supports per tank were added for center well. (See center well grandstand layout on Page 13.) Support all center wells to concrete. 10.
IMPORTANT: First piece of flooring must start at the proper distance from center of bin. First few pieces may have to be trimmed for proper fit. NOTE: Every other row to be staggered. Unsupported ends of floor pieces not to exceed 7 inches. * 2 Supports per tank were added for center well. (See center well grandstand layout on Page 13.) Support all center wells to concrete. 10. 18' Cut-Lok/Cor-Lok and Grandstand Layouts 18' Cor-Lok/Cut-Lok and 20 Gauge Grandstand Layout 2.
PNEG-214 12'-18' Cor-Lok and Cut-Lok Flooring IMPORTANT: First piece of flooring must start at the proper distance from center of bin. First few pieces may have to be trimmed for proper fit. NOTE: Every other row to be staggered. Unsupported ends of floor pieces not to exceed 7 inches. * 2 Supports per tank were added for center well. (See center well grandstand layout on Page 13.) Support all center wells to concrete. 10.
IMPORTANT: First piece of flooring must start at the proper distance from center of bin. First few pieces may have to be trimmed for proper fit. NOTE: Every other row to be staggered. Unsupported ends of floor pieces not to exceed 6 inches. * 2 Supports per tank were added for center well. (See center well grandstand layout on Page 13.) Support all center wells to concrete. 10. 18' Cut-Lok/Cor-Lok and Grandstand Layouts 18' Cor-Lok/Cut-Lok and 20 Gauge Grandstand Layout 4.
11. 20 Gauge Floor Support Requirements 20 Gauge Grandstand Chart - 2.66" Corrugation Narrow/2.66" Corrugation - 20 Gauge Grandstand Floor Support Chart Dia.
11. 20 Gauge Floor Support Requirements 20 Gauge Grandstand Chart - 4.00" Corrugation Wide/4.
12. Flashing Support Stiffeners Stiffener Flashing Support Instructions for Internal Universal Stiffeners 1. Install the floor and support system, cutting the floor to go around the internal stiffeners as required. 2. Break the stiffener flashing support (SS-6984) into its three (3) components. 3. Lay the flashing supports on top of the flooring and weld the flashing supports to the stiffener as close as possible. Fasten the flashing to the wall, flashing support, and floor.
13. Air Flow Support Instructions Installation of Air Flow Supports 1. Determine the spacing and quantity of air flow supports required from the chart on Page 32. Make sure that the correct supports have been ordered for use with the proper depth of plank (either 1-1/8" or 1-3/8" deep). 2. Mark center of bin. 3. Install discharge auger. 4. Mark spacing lines parallel to discharge auger. 5.
13. Air Flow Support Instructions The following Figure 13A show methods of support placement to achieve the necessary spacing close to discharge augers and sumps.
13. Air Flow Support Instructions * Installation, Spacing and Quantities of Air Flow Supports Under Channel Lock Floors Bin Diameter - Number of Supports Grain Depth at Bin Wall (ft.) Spacing (in.) Full Double Single Full 18' 30" 34 2 8 48 2 10 60 2 18 Ft. Dia. 21 Ft. Dia. 24 Ft. Dia. Double Single Full 27 Ft. Dia. 30 Ft. Dia.
13.
13. Air Flow Support Instructions Installation, Spacing and Quantities of Air Flow Supports Under Channel Lock Floors York and Chief Bins Bin Diameter - Number of Supports Grain Depth at Bin Wall (ft.) 15' 6" Spacing (in.
13. Air Flow Support Instructions Installation, Spacing and Quantities of Air Flow Supports Under Channel Lock Floors Behlen Bins Bin Diameter - Number of Supports 16' 5" 19' 8" 22' 11" 26' 3" Grain Depth at Bin Wall (ft.) Spacing (in.
NOTES 36 PNEG-214 12'-18 Cor-Lok and Cut-Lok Flooring
14. Warranty The GSI Group Warranty THE GSI GROUP (GSI) WARRANTS ALL PRODUCTS WHICH IT MANUFACTURES TO BE FREE OF DEFECTS IN MATERIAL AND WORKMANSHIP UNDER NORMAL USAGE AND CONDITIONS FOR A PERIOD OF 12 MONTHS AFTER RETAIL SALE TO THE ORIGINAL END USER. THE PURCHASER’S SOLE REMEDY AND GSI’S ONLY OBLIGATION SHALL BE TO REPAIR OR REPLACE, AT GSI’S OPTION AND EXPENSE, PRODUCTS THAT, IN GSI’S SOLE JUDGMENT, CONTAIN A MATERIAL DEFECT DUE TO MATERIALS OR WORKMANSHIP.
This equipment shall be installed in accordance with the current installation codes and applicable regulations which should be carefully followed in all cases. Authorities having jurisdiction should be consulted before installations are made. GSI Group 1004 E. Illinois St. Assumption, IL 62510-0020 Phone: 1-217-226-4421 Fax: 1-217-226-4420 www.gsiag.