Manual

2 PNEG-012 Vane Axial Heater
Heater Check List
1. All wire connections
2. Spark plug gap 0.125
3. Pipe train tightness and gas leaks
4. Flame sensor tight
5. Fuse in place, extra fuse provided
6. Time delay reset
7. Indicator light
8. Pressure gauge
9. Regulator adjusted
10. Shut off valve operates correctly
11. Vapor high-limit
12. Unit cycles ON to OFF
13. Heat rise even across transition
14. Unit cycles high to low (high-low only)
15. Modulating valve holds temperature within 1° (mod units only).
16. All decals and serial number tag
17. Aesthetic appearance
18. Manual
Tester Signature:___________________________
Date: ____________________________________