User guide

5. Sidewall Construction
PNEG-1276 Top Dry Autoflow Construction Manual 24', 30' and 36' 23
Sidewall Erection Instructions
Before bolting the sidewall sheets together, check that you have the proper gauge steel for the first ring.
The higher gauge numbers denote the thinner materials. (For example, 22 gauge material is thinner than
14 gauge.) In erecting most grain bins the thinnest material usually goes on top, therefore the first sidewall
ring you assemble will be the top ring of the bin. Check the various gauges of the bin with the color code
chart and begin building accordingly REMEMBER.....Assemble the top ring first.
Once you have selected the proper gauge material, begin assembling all sidewall sheets in the following
manner: Standing on the inside the bin, place the left panel to the inside with the right panel to the outside.
(See Figure 5A.)
Check to see that the sidewall sheet is “Right side up”.
Refer to Page 21
for details.
Figure 5A
Gauge Color Code
22 White
20 Red
19 Black/Yellow
18 Orange
17 Pink/Light Blue
16 Blue
15 Brown/Red
14 Green
13 Yellow/Blue
12 Black
11 Pink
10 Light Blue
9 Blue/Orange
8 Yellow