User Manual
Chapter 1 Top Dry Air Box Assembly
Assemble Top Spout to Support Frame
The top spout is fastened to the top of the air box using three bolts through threaded plates located on the
inside of the box.
1. Align holes in bottom of top spout (A) with holes in rubber gasket (C) and support frame top (D).
2. Fasten together using only three bolts (B). Do not install the bolt located on the door side.
Callout Part Number Description
A TD-101313 Air Box Top Spout Weldment
B S-277 5/16”-18 X 1–1/4” Grade 5 Bin Bolt
C TD-101325 Rubber Gasket Seal
D TD-101155 Air Box Support Frame
10 Pneg-1890 Top Dry Air Box