GRANDIO G R E E N H O U S E S 2015 GRANDIO ELITE 8x12, 8x16, 8x20, 8x24 KIT MANUAL INCLUDES INSTRUCTIONS FOR BACK DOOR TRANSFORMATION Grandio Elite 8x24 Shown In Image GREENHOUSE USER MANUAL © 2013 Grandio Greenhouses, Backyard Living Source Inc.
GRANDIO G R E E N H O U S E S Dear Valued Customer, We would like to congratulate you on your new Grandio Greenhouse purchase. We are confident that you have made the right decision in choosing Grandio. Our greenhouses are made with high quality aluminium and polycarbonate and will last for many garden seasons to come. Please take the time to carefully read this instruction manual for an easier and more enjoyable assembly experience.
IMPORTANT! SAFETY INSTRUCTIONS FAILURE TO FOLLOW THESE WARNINGS MAY RESULT IN SERIOUS INJURY OR PROPERTY DAMAGE AND WILL VOID WARRANTY. To ensure safety, do not attempt to assemble this product without following the instructions carefully. Check entire box and inside all packing material for parts and/or additional instruction materials. Before beginning assembly, read the instructions and identify all parts using the hardware identifier and parts list on pages 67-76.
GRANDIO © G R E E N H O U S E S ASSEMBLY INSTRUCTION STEPS PREPARE FOR ASSEMBLY STEP ONE: BASE ASSEMBLY STEP TWO: FRONT ASSEMBLY STEP THREE: BACK ASSEMBLY STEP FOUR: MIDDLE ASSEMBLY STEP FIVE: EXTENSION ASSEMBLY STEP SIX: DOOR ASSEMBLY STEP SEVEN: INTERIOR ROOF SUPPORTS 3 Introduction.............................................................................1 Safety Instructions.................................................................2 Prepare For Assembly......................................
PREPARE FOR GREENHOUSE ASSEMBLY IMPORTANT: BASE KIT ASSEMBLY & GREENHOUSE PLACEMENT 8X12 GRANDIO ELITE BARN STYLE GREENHOUSE DIMENSIONS Before assembling your new greenhouse, a proper foundation must be prepared. A number of anchoring options are acceptable, based on wind and ground conditions in your area. The UV-Protected side is covered with transparent film and must face toward the sun. The side covered in white film will always face the interior of the greenhouse.
EXTENSION KIT BOX CONFIGURATIONS We recommend that you lay all of your boxes out as shown below for an organized assembly. Locate your greenhouse size and situate near your assembly site. We suggest you lay the parts out on a tarp so you do not lose items in the grass or dirt near your building site. *See the reference diagrams on pages 6-10 for more information about how the parts will go together and what makes up each section for the assembly.
BACK L08A 606-WS L08B-X 606-WS 606-WS DIAGRAM SHOWS THE ASSEMBLED (8’x8’ BASIC CONFIGURATION) (GRA-ELI-8A & GRA-ELI-8P & GRA-BA-8) 8x8 ELITE KIT INCLUDES, FRONT, BACK, BASE AND SIDES.
4X Elite Side 7 8x8 Elite Side 602A 602A 603C/616 609 Y7 Y7 L08D-X Y8 609 602B Y8 602B 618 Y9 Y10 602B 610 609 L08D-X Y8 602B In boxes GRA-ELI-8A and GRA-ELI-8P, the base for 8x8 is all in GRA-BAS-8. 602B 610 601B 601A-FL L08E-X Y11 602B Y11 602B Y11 602B Y11 630 L08E-X 602B Y11 607 623B Y6 620 622 622-R Y6 623B 630 Y1 In boxes GRA-ELI-8A and GRA-ELI-8P, the base for 8x8 is all in GRA-BAS-8.
(8’ Extension Side) 8X Elite Side 8x8 Elite Side 602A 602A 603C/616 602A 602A 602A 8 Y8 L08D-X Y8 609 602B In boxes GRA-ELI-8A and GRA-ELI-8P, the base for 8x8 is all in GRA-BAS-8.
(8’ Extension Side) 8X Elite Side (4’ Extensions Side) 4X Elite Side 9 606-WS 609 Y7 Y7 L08D-X Y8 609 602B Y8 602B 618 Y9 Y10 LEFT SIDE 602A 602A Y7 602B 610 L08E-X Y11 602B 601A-FL Y11 602B Y11 602B 601B 630 L08E-X 610 609 L08D-X Y8 Y11 602B 602B Y11 602B Y11 Y11 Y11 601B 610 630 L08E-X 602B 618 Y9 Y10 602B Y8 602B Y8 In boxes GRA-ELI-8A and GRA-ELI-8P, the base for 8x8 is all in GRA-BAS-8.
(8’ Extension Side) 8X Elite Side (8’ Extension Side) 8X Elite Side 10 609 Y7 L08D-X Y8 609 602B Y8 602B 618 Y9 Y10 602B 610 L08E-X Y11 602B 601A-FL Y11 602B Y11 602B 601B 610 601B 630 L08E-X 610 609 L08D-X Y8 Y11 602B Y11 602B Y11 Y11 602B LEFT SIDE 602A Y7 Y7 Y7 609 Y7 618 Y9 Y10 602B Y8 602B Y8 In boxes GRA-ELI-8A and GRA-ELI-8P, the base for 8x8 is all in GRA-BAS-8.
BASE KIT ASSEMBLY INSTRUCTIONS Pre-Plan The Placement Of Your Structure Allow enough room to get a wheel barrow in and around your structure. Be sure the orientation will allow for proper drainage in and around your greenhouse. It is recommended that you place your greenhouse in an area of your property that receives the most sunlight but is also somewhat protected by trees, fencing or your home for wind protection and also to keep the temperature up during early spring and late fall.
BASE KIT PARTS LIST GRAPHIC PART NAME SIZE/LOCATION QUANTITY BA-S1 97 3/8 in / 2474 mm 2 BA-S2 94/4 in / 2394 mm BA-C3 GRAPHIC SIZE/LOCATION QUANTITY BA-S5 46 3/4 in / 1187 mm 1 2 BA-S6 46 3/4 in / 1187 mm 1 5 7/16 in 138 mm 4 BA-C4 8 7/16 in / 214 mm 2 BA-A1 9 13/16 in / 250 mm 4 BA-A1 9 13 /16 in / 250 mm 2 BA-S03 M6*14 28 BA-S10 1/2 x 3/4 2 BA-M03 NUT 28 BA-S03 M6*14 16 W05 CLIPS 9 BA-M03 NUT 16 12 PART NAME PARTS LIST FOR BASE KIT (GRA-BA-4X) BASE AND
BASE KIT PARTS LIST (GRA-BA-8X) BASE AND ACCESSORY PACKING LIST PARTS WILL BE FOUND IN (GRA-ELI-8XA) BOX GRAPHIC PART NAME PARTS LIST FOR BASE KIT SIZE/LOCATION QUANTITY BA-S3 93 7/16 in / 2374 mm 1 BA-S4 93 7/16 in / 2374 mm 1 BA-C4 8 7/16 in /214 mm 2 BA-A1 9 13/16 in / 250 mm 2 BA-S10 1/2 X 3/4 2 BA-S03 M6*14 16 BA-M03 NUT 16 13
8x12 BASE KIT ASSEMBLY INSTRUCTIONS (GRA-BA-8) AND (GRA-BA-4X) 1.1 Layout all base kit pieces to prepare for assembly. Note that one BA-S1 will be at the front BA-S5 and one BA-S1 will be at the back and the BA-S2’s will be on the sides attaching to the front BA-S1. The BA-S5 and BA-S6 will attach to the back BA-S1, see diagram . 1.2 Attach the BA-S2 to the BA-S5 with the BA-C4 using the BA-S03 and BA-M03. See . Repeat for other side connecting the BA-S6 and the BA-S2. Go to page 18 for the next step.
8x16 BASE KIT ASSEMBLY INSTRUCTIONS (GRA-BA-8) AND (GRA-BA-8X) 1.3 Layout all base kit pieces to prepare for assembly. Note that one BA-S1 will be at the front BA-S3 and BA-S1 will be at the back and the BA-S2’s will be on the sides attaching to the front BA-S1. The BA-S3 and BA-S4 will attach to the back BA-S1. See diagram . 1.4 Attach the BA-S2 to the BA-S3 with the BA-C4 using the BA-S03 and BA-M03. See . Repeat for other side connecting the BA-S4 and the BA-S2. Go to page 18 for the next step.
8x20 BASE KIT ASSEMBLY INSTRUCTIONS (GRA-BA-8) AND (GRA-BA-8X) AND (GRA-BA-4X) 1.5 Layout all base kit pieces to prepare for assembly. Note that one BA-S1 will be at the front and one BA-S1 will be at the back and the BA-S2’s will be on the sides attaching to the front BA-S1. The BA-S5 and BA-S6 will attach to the back BA-S1. See diagram . 1.6 Attach the BA-S2 to the BA-S3 with the BA-C4 using the BA-S03 and BA-M03. See .
8x24 BASE KIT ASSEMBLY INSTRUCTIONS (GRA-BA-8) AND (GRA-BA-8X) AND (GRA-BA-8X) 1.7 Layout all base kit pieces to prepare for assembly. Note that one BA-S1 will be at the front and one BA-S1 will be at the back and the BA-S2’s will be on the sides attaching to front BA-S1. The BA-S3 and BA-S4 will attach to the back BA-S1. The BA-S3 will attach to the other BA-S3 and BA-S4 will attach to the other BA-S4 See diagram . 1.8 Attach the BA-S2 to the BA-S3 with the BA-C4 using the BA-S03 and BA-M03. See .
BASE KIT ASSEMBLY INSTRUCTIONS 1.9 Slide the BA-C3 into the BA-S1, slide the BA-S2 into the BA-C3, align the holes and push together to an even and tight position and use the BA-S03 Bolt and BA-M03 Collard Nut combo, tighten the collard nut on the inside of the base kit using the 10mm wrench. Repeat this process on all corners. See and . Note: BA-S1 will be the front and back, while the BA-S2’ s will be the sides of your greenhouse base. 1.
BASE KIT GROUND INSTALLATION **BASE MUST BE LEVEL & SQUARE, FOUNDATION MUST BE PROPERLY ANCHORED PRIOR TO GREENHOUSE ASSEMBLY 1.11 BA-A1 must be buried in ground. See . Dig holes to bury the BA-A1’s, you determine size and depth for your location. We recommend you use: Quikrete fast setting concrete to anchor base. Follow the directions on the package. Outdoor Ground Assembly BA-S2 Make sure base is squared and level before setting anchor into concrete.
BASE KIT DECK INSTALLATION **BASE MUST BE LEVEL & SQUARE, FOUNDATION MUST BE PROPERLY ANCHORED PRIOR TO GREENHOUSE ASSEMBLY 1.12 Holes are present in base kit for anchoring bolts see and . You determine and acquire proper fastener prior to installation for your surface. Discard the BA-A1 and BA-S10 for deck or cement pad installation. Use lag bolt or concrete anchors to attach base. (Fasteners not included). BA-S1 BA-S2 BA-S6 Deck or Patio Assembly BA-S2 BA-C3 HOLE FOR ANCHOR BOLT OR SCREW.
FRONT FRAME ASSEMBLY INSTRUCTIONS ALWAYS ASSEMBLE FRONT HORIZONTAL This picture shows the inside view of front section fully assembled. All parts for front assembly will be found in box GRA-ELI-8A and GRA-ELI-8P. We recommend that you assemble the front on a tarp. * If you purchased the Back Door Transformation kit you will repeat this section for your back wall using parts found in GRA-ELI-8A & GRA-ELI-BD boxes. If you want to purchase the Back Door Transformation kit call 1-866-448-8231.
FRONT FRAME ASSEMBLY CONTINUED ALWAYS ASSEMBLE FRONT HORIZONTAL 2.1 Prethread all S05 screws into the WG01 and WG02’s for ease of installation, see only turn S05 a few turns. S05 2.2 Use WG01 bracket to attach the (2) WG01 601B 601B’s together with the 603E, secure parts with the S05 screws provided see . The WG01 will slide into the groove of the 601B’s, and also slide into the groove of the 603E, screw head will remain outside channel. WG02 603E 2.
FRONT FRAME ASSEMBLY CONTINUED ALWAYS ASSEMBLE FRONT HORIZONTAL 2.4 Insert polycarbonate panels Y3-2 and Y3-1 into place as shown in . WG01 601B 2.5 Attach 603E and 603D with W04 and S04/ML01 fasteners as shown in WG02 WG02 603E . 2.6 Attach the 603D to the 601B’s Y3-2 601B using the W04-1’s with the S04/ML01 fasteners on both sides as shown in .
FRONT FRAME ASSEMBLY CONTINUED ALWAYS ASSEMBLE FRONT HORIZONTAL 2.7 View diagrams and attach the (2) 604’s and (2) 601A’s to the 619. Note the orientation of the 604’s, there are 4 different 601A’s (2) for the front and (2) for the back with different hole placements. The large holes should be at the top and facing forward on the front frame assembly. See diagram on this page. The 601-FR and the 601-FL will have a hole at the top side and will face forward.
FRONT FRAME ASSEMBLY CONTINUED ALWAYS ASSEMBLE FRONT HORIZONTAL 2.8 Attach 606-WS to 619, this will hold the polycarbonate panels in place. If it seems too tight slide fingers or nut driver along edges, gently stretching the 606-WS to allow room for panels to fit . Polycarbonate panel OUTSIDE 606-WS 619 604-R 604-L Y1 2.9 Insert Y1 polycarbonate panels into place, make sure Y1’s slide completely into 606-WS as shown in . Y1 601A-FL 601A-FR 2.
FRONT FRAME ASSEMBLY CONTINUED ALWAYS ASSEMBLE FRONT HORIZONTAL 2.12 Move roof and front section together WG02 601B 601A-FR S05 601B 2.13 Attach the L08A-X to L08D and 604 to square front section loosen S04/ML01 attached to the bottom of the (2) 604’s, square the frame with carpenter square or use a measuring tape to make sure corner measurements are the same, also check distance across from the top of 601A’s, and also to the bottom of the 601A’s across, make sure distance is the same.
BACK ASSEMBLY INSTRUCTIONS ALWAYS ASSEMBLE BACK HORIZONTAL This image shows the inside view of the back wall assembly. All parts for back assembly will be found in box GRA-ELI-8A and GRA-ELI-8P. We recommend that you assemble the back wall on a tarp. * If you are using the Back Door Transformation Kit you will skip this section.
BACK CONTINUED ALWAYS ASSEMBLE BACK HORIZONTAL WG01 and WG02, see FAT END FAT END . 3.2 Use the WG01 bracket to attach the WG02 (2) 601B’s together, secure parts by sliding the WG01 into the 601B’s as shown in diagram . 3.3 Install WG02’s to connect (2) 601B’s WG01 WG02 S05 601B when firmly placed between the extrusions tighten the S05 screws, see . WG01 601B WG02 601B STEP THREE 3.1 Prethread all S05 screws into the 601B IMPORTANT: Be careful moving or you may bend bracket.
BACK CONTINUED ALWAYS ASSEMBLE BACK HORIZONTAL 3.4 Attach (2) 601A-B’s to L08A using S04/ML01 fastener as shown in diagram . Attach (2) 602D’s to L08A using S04/ML01 fasteners as shown in diagram . Attach 602C to L08A using S04/ML01 fastener as shown in diagram . Y1 3.5 Attach the (4) 606-WS’s to the L08A as shown STEP THREE in . 3.6 Insert the Y1 polycarbonate panels into the Y1 Y1 602D 601A-B grooves of 601A, 602D and 602C. Make sure Y1 panels are inserted into 606-WS as shown in .
BACK CONTINUED ALWAYS ASSEMBLE BACK HORIZONTAL 3.7 Set (4) 603C’s atop each Y-1 panel, then align the pre threaded S04-ML01 fasteners in each 603C to the L08B and to each 601A-B, 602D and the 602C. When aligned tighten the middle first and work your way outward. See diagrams , , . Y4-2 3.8 Insert the Y5-1 and Y5-2 polycarbonate panels Y5-2 Y5-1 Y4-1 into place. Then insert the Y4-1 and Y4-2 into place as shown in the diagram.
BACK CONTINUED ALWAYS ASSEMBLE BACK HORIZONTAL WG01 3.9 Pre thread the S05 screws on WG01, WG02’s and the S04/ML01 W04-2’s brackets and place into appropriate extrusion see , and . Align WG02’s into 601A’s, the W04-2’s into 602D’s, and the WG01 into the 602C. When all members are snug tighten all fasteners to lock into place.
BACK CONTINUED ALWAYS ASSEMBLE BACK HORIZONTAL 3.10 A. Attach (2) L08B-X’s to (2) 602D’s and L08A with S04/ML01 as shown in . B. Attach (2) L08B-X’s to the (2) 601A-B’s with fasteners as shown in . L08B-X 601A-B 602D 602C 602D STEP THREE S04/ML01 602D L08B-X L08A Inside View L08B-X L08B-X ML01 S04 Square by loosening bolts T I P attached to the tops of the L08B-X, use measuring tape to make sure corners to corner measures the same.
MIDDLE ASSEMBLY INSTRUCTIONS Warning: The person(s) holding the front or back sections vertical must continue to do so until the L08C-X angle supports are attached securely to the front and base as shown in step 4.5. Failure to hold front vertical will cause the front to fall and damage the base kit, front framing etc. Damage caused by improper installation is not warrantable. STEP FOUR If building a greenhouse with a front and back door you will repeat steps 4.1-4.
MIDDLE ASSEMBLY CONTINUED 4.3 Attach L08C-X to 601A and the BA-S2 with S04/ML01 on both sides as shown in and combos. 4.4 Attach the front section 619 to the base using (3) S04/ML01 fasteners as shown in to the inside of the 619 with (5) self tapping screws included in the package, see .
MIDDLE ASSEMBLY CONTINUED 4.5 Have person (1) continue to hold the front vertically while the other attaches the font section to the base with W05/S04/ML01 fasteners as shown in , and . The (4) W05 clips will catch the under edge of the front base kit and then slide upward attaching to the bottom of the 601A’s and the 604’s.
MIDDLE ASSEMBLY CONTINUED If you are using the Back Door Transformation kit you will repeat steps 4.1-4.5 to install the Back Door Wall, then skip ahead to step 4.9. 4.6 Attach back wall 601A’s with back base corners using S04/ML01 on both sides as shown in 4.7 Attach bottom of L08C-X to rear section of base kit with S04/ML01, as shown in as shown in , make sure the S04/ML01 combos are tight. . . Attach the L08C-X to the 601A 4.
MIDDLE ASSEMBLY CONTINUED 4.9 Attach the 607 to 607 extension with the 607-XS and the (4) S08 screws provided see , . The S08 screws are to be installed on the inside as shown in diagram . Wait to tighten the screws all at one time when both sections are aligned correctly, apply even pressure while tightening. 607-XS 607 S08 STEP FOUR 4.10 Apply a bead of silicone to the seam where the 607’s meet and to the holes where the S06 screws will attach the DP01 to the 607 ridge. See .
MIDDLE ASSEMBLY CONTINUED 4.11 With 2 people, attach the ridge to front and back by sliding into place as Side Angle View shown in and , using S04/ML01 fasteners attach the 607 to the 601B’s. See for how the final orientation should be.
EXTENSION ASSEMBLY INSTRUCTIONS STEP FIVE Warning: You will need a minimum of 2 people to complete this section, you will not be able to stop assembly until page 45. Note that if you are assembling an 8x20 or an 8x24 greenhouse you will proceed thru the 2nd extension assembly instructions. Damage caused by improper installation is not warrantable.
EXTENSION ASSEMBLY INSTRUCTIONS 5.1 Connect the (2) braces labeled L08M-X / L08C-X together with the 5.2 Attach the 602A to the base with a nut and bolt combo where the extension kits meet on the base kit, with other person holding the 602A in place. Measure down 6” from the top of the 602A to attach the W14 bracket to the 602A on both sides with the S04/ML01 . See and . Attach the assembled L08M-X’s to the W14 as shown in and . L08M-X L08M-X This part is labeled with 2 stickers L08C-X and L08M-X.
EXTENSION ASSEMBLY INSTRUCTIONS 5.4 Attach the 609-XS to 609 with the (2) S09 screws provided INSIDE VIEW STEP FIVE see . The S09 screws are to be installed from the outside of the 609, see . 609-XS Pay special attention to the orientation of the 609, make sure the correct side faces down, see .
EXTENSION ASSEMBLY INSTRUCTIONS 5.5 With 2 people proceed to install 609 in this Inside View Inside View LOOSEN ML01 1. With one person holding the 609 level and in position have the other person loosen the top of the L08C-X and let it fall free, attach the 609 to the 601B using S04/ML01 (nut and bolt). See and . L08C-X 601B 601B 609 601A L08D S04/ML01 L08D L08C-X 2.
EXTENSION ASSEMBLY INSTRUCTIONS STEP FIVE 4. Note the top of 602A should touch the line on the 609 for exact placement, see . Attach the 609 to the 602A with the S04/ML01 nut and bolt combos see diagram . 5. Repeat steps 1-4 on the other side see . NOTE EXACT PLACEMENT OF THE 602A TO THE 609.
EXTENSION ASSEMBLY INSTRUCTIONS 5.6 Moving up to the midroof 609, with person 1 holding the 609 in place person 2 will attach the 609 to the front of the . STEP FIVE greenhouse to the 601B’s, see . Person 1 will continue holding the 609. 5.7 Person 2 will attach the 602B to the 609’s see .
EXTENSION ASSEMBLY INSTRUCTIONS 5.8 With two people attach the AZ-1 to the base and the lower 602A, see STEP FIVE . Next attach the upper end to the mid roof line touching the 609 see for exact placement. Install on both sides of the greenhouse where the extension seams meet using the S02/ML01 combo. 5.9 Install the BZ-1 to the upper mid roof, to act as the support to the peak of the roof as shown between the (2) 602B’s.
2nd EXTENSION ASSEMBLY INSTRUCTIONS CONTINUE FOR 8X20 AND 8X24 ONLY / FOR 8X12 AND 8X16 SKIP AHEAD TO PAGE 51 OR STEP 5.19 the nut and bolt combo S04/ML01 see . The combined L08M-X’s should measure about 94 1/2” when connected together. 5.11 Attach the 602A to the base with a nut and bolt combo Measure down 6” from the top of the 602A to attach the W14 bracket to the 602A on both sides with the S04/ML01 . See and . Attach the assembled L08M-X’s to the W14 as shown in and .
2nd EXTENSION ASSEMBLY INSTRUCTIONS CONTINUE FOR 8X20 AND 8X24 ONLY / FOR 8X12 AND 8X16 SKIP AHEAD TO PAGE 51 OR STEP 5.19 STEP FIVE 5.13 Attach the 609-X to 609 with the (2) S09 screws provided INSIDE VIEW see . The S09 screws are to be installed from the outside of the 609, see . 609-XS Pay special attention to the orientation of the 609, make sure the correct side faces down, see .
2nd EXTENSION ASSEMBLY INSTRUCTIONS 5.14 With 2 people proceed to install 609 extension at the eave GAP FOR SCREWS 609 or lower mid roof in this order. 609 1. With one person holding the 609 level and in position have the other person attach the 609 to other end of the 609-XS as shown in . 2. With one person holding the 609 level and in position have the other person attach the 609 to the 602A using S04/ML01. See . S09 3. Repeat steps 1. and 2. on other side of the greenhouse.
2nd EXTENSION ASSEMBLY INSTRUCTIONS STEP FIVE CONTINUE FOR 8X20 AND 8X24 ONLY / FOR 8X12 AND 8X16 SKIP AHEAD TO PAGE 51 OR STEP 5.19 5.15 With person 1 holding the 609 in place person 2 will attach the 609 to the 609-XS with the (2) S09’s screws to the upper mid roof see . Person 1 will continue holding the 609. 5.16 Person 2 will attach the 602B to the two 609’s with (2) S04/ML01 (nuts and bolts) see . Attach one more 602B between the 609 and 607 with (2) S04/ML01 (nuts and bolts), see .
2nd EXTENSION ASSEMBLY INSTRUCTIONS CONTINUE FOR 8X20 AND 8X24 ONLY / FOR 8X12 AND 8X16 SKIP AHEAD TO PAGE 51 OR STEP 5.19 . Then attach the upper end to the mid roof line touching the 609 see for exact placement. Install on both sides of the greenhouse where the extension seams meet using the S02/ML01 combo. 601B BZ-1 S04 ML01 609 5.18 Install the BZ-1 to the upper mid roof, to act as the support to the peak of the roof as shown between the (2) 602B’s.
MIDDLE BACK ASSEMBLY INSTRUCTIONS 5.19 With two people attach the 609 extension to 609-XS with the (2) S09 screws provided see and 601B STEP FIVE 5.20 With person 2 still holding in place have person 1 loosen the S04/ML01 L08B L08C-X 601B Repeat these steps on other side of the greenhouse, and then mid roof line see 609 609 L08C-X nut and bolt combo, allow to fall out of place, then align the 609 into place with the 601B and 601A, see .
MIDDLE ASSEMBLY INSTRUCTIONS CONTINUED of the greenhouse you will need to loosen the ML01 (nut) attached to the L08C-X and the base. See diagram . Remove and set aside the L08D-X supports. 1. Once the bottom of one L08C-X is loosened set the 602A onto the bolt of the L08C-X. Be sure the 602A is aligned and sitting flush on top of the base kit. See for reference. Inside View 602A 609 602A ML01/S04 ML01/S04 L08C-X BA-S2 BASE 602A 3. Repeat steps 1. and 2.
MIDDLE ASSEMBLY INSTRUCTIONS CONTINUED STEP FIVE 5.22 Install only the upper roof line 602B’s Outside View between the 607 and the 609 along the entire upper roof line with S04/ML01 (nut and bolt). See and . Repeat on other side of roof section. 607 602B Do Not attach lower roof 602B’s yet, they will get in your way when installing the upper roof panels and roof vents.
MIDDLE ASSEMBLY INSTRUCTIONS CONTINUED slide the 630 into the groove of the upper 609 as 607 shown to hold Y11’s in place. See and . Note 630 that you may need to loosen the bottoms of some of Y11 the 602B’s to slide the 630’s into place as the fit is 609 Y11 very tight. Check that all nut and bolt combos are tightened again after installation of 630’s. Note that 601B there is a 630 in the extension box(s), make sure you install so the screw holes on the 630’s align for the DP03 to attach.
MIDDLE ASSEMBLY INSTRUCTIONS CONTINUED STEP FIVE 5.24 Assemble the roof window vents as shown below in and , using the Z02 screws attach the 615, 616, and 618’s with the Y10 panel as shown, be careful not to strip the screw heads. Pay attention to the Y10 panel, as the stickers must face the sun. 630 Y10 5.25 Insert assembled window into the end of the ridge of 630 and slide into position. See .
MIDDLE ASSEMBLY INSTRUCTIONS CONTINUED 5.26 Attach all remaining 602B’s between the 609’s, after all roof vents are positioned see . 5.27 Install plastic strip 606-WS before inserting . 5.28 After Y7’s are installed on both sides, loosen bolts attached to L08C-X in all upper corners. Using a level, adjust 602A and tighten bolts. Repeat in every corner until the greenhouse is plumb. The top edges of Y7’s will align when greenhouse is level or plumb.
MIDDLE ASSEMBLY INSTRUCTIONS CONTINUED 5.29 To ensure there is no gap in roof vent STEP FIVE 616 Inside view of 603C 603C position 603C as shown in . Connect 603C to middle of 602B’s using W04 bracket as shown in . 602B 5.30 Attach HQC01 to 616 with the Z04 screws see , close roof vent and attach the handle onto HQC02 middle pin (the first two holes of the handle to the second and third pins of HQC02). Then attach HQC02 into 603C’s track with S04/ML01 (nuts and bolts), see .
MIDDLE ASSEMBLY INSTRUCTIONS CONTINUED 5.31 Remove the L08M-X support combo, take apart and use as L08C-X now and install on the sides of the AZ1 extension brace, as shown in . Note that the L08C-X and L08M-X have been labeled with both stickers in this instance as this part has 2 uses. Save the hardware and W14 bracket for possible future use or hang inside as a plant hanger clip. 5.33 Slide 610 Gutters into 609’s groove as shown in diagram . Repeat on both sides.
MIDDLE ASSEMBLY INSTRUCTIONS CONTINUED STEP FIVE 5.34 Apply a small amount of the silicone caulk to the seam 610 where the 610 gutters meet, then attach the DP02 on the inside of the gutter and the DP02B will slide under the gutter and will rest above the 602A. Apply silicone to the holes where the S07 screws will attach the 610 gutters to the DP02 and DP02B. Note the DP02B has pre-tapped holes to accept the screws and hold tight. See diagram and .
MIDDLE ASSEMBLY INSTRUCTIONS CONTINUED 5.34 Attach JG01, JG02A, JG02B, JG03A and JG03B end caps to the ridge, JG01 JG02A JG02B STEP FIVE midroof and gutters on both front and back as shown below. Squeeze a small amount of rubberized silicone into the ends of ridge, mid roof, and gutters to secure pressure fit end caps, as shown in the images to the right. Use Z03 screws to attach the JG03A and JG03B endcaps along with the silicone adhesive.
STEP SIX DOOR ASSEMBLY DIAGRAM This image shows the inside view of Right Door Assembly. All parts for door assembly will be found in box GRA-ELI-8A and GRA-ELI-8P. Use the #2 head Phillips Screw Driver for installation. If you are using the Back Door Transformation kit you will repeat steps 6.1-6.11 to install the Back Door, these parts will be found in box GRA-ELI-BD.
We recommend you lay out all parts for both doors to make sure they match up correctly for hanging. Double check the orientation of what is inside verses outside and how the doors will hang on page 63-67. Make sure window panels face the right direction to the sun and note that the panels have predrilled holes for the handles to attach later and these need to be aligned with the lock mechanisms. This will save you from assembling the wrong way. Be careful not to strip the phillips heads when assembling. 6.
STEP SIX DOOR ASSEMBLY CONTINUED 6.4 Insert J08A into the bottom of the 622-R and 622-L, note the bottom has a groove see . 6.5 Attach the 622-L to the 623B, 623A and 620 using the Z01 screws as shown in . 6.6 Follow the same instructions for the other door making sure that the 622-L and 622-R with the double ball catch match up so doors will latch closed and slide properly .
6.7 Slide the (2) S02 bolts down the track of the L21 see , align with the holes on the 603D door header. With one person inside the greenhouse line up hanging door track L21 with door header 603D, move bolts on L21 to line up with bolt holes on door header 603D. From the inside hand tighten the ML01 nut while the person outside is holding the L21 in position, you will now center on the front of the greenhouse and tighten the S02/ML01 combo.
STEP SIX DOOR INSTALLATION 6.8 Separately slide the top of the doors in the left and right side of L21, see diagram , until they latch in the middle. 6.9 Attach the door handles 622-HNDL to both doors using the 622-HNDL-NUT/BOLT provided to both doors as shown below in , and . **We included some felt dots in your Grandio Welcome Kit, please apply to the inside bottom edge of the 623B as shown in these felt dots will make your doors fit snug and slide smoothly.
STEP SIX DOOR INSTALLATION 6.10 Attach L28 to L21 with S04/ML01, and L28 to 601A with S02/ML01 as shown below in diagram and . Check that the L21 and L28’s are square. Attach (2) J07 to the ends of L21 see . The L28 should align square to the 601A. 6.11 Check that the door locks are snug, you may adjust them with screwdriver if needed as they can be tightened or loosened.
INTERIOR ROOF SUPPORT ASSEMBLY 7.1 Attach the L08E-X to the upper roof section 609 as shown with S04/ML01 fasteners already in place where the 607 meets the 601B, and the 609 and the 602B meet see , repeat this on the front section of the greenhouse, and where extensions meet at the AZ-1. 7.
(GRA-ELI-8A) 8x8 GRANDIO ELITE ALUMINUM PACKING LIST PART NAME GRAPHIC PART NAME SIZE/LOCATION QUANTITY SIZE/LOCATION QUANTITY 56 9/16 in / 1437 mm 2 604-R 70 3/4 in / 1797 mm FRONT RIGHT 1 FRONT LEFT CORNER 1 604-L 70 3/4 in / 1797 mm FRONT LEFT 1 601A-FR 56 9/16 in / 1437 mm 1 607 94 1/4 in / 2394 mm 1 601B 29 7/16 in / 748 mm 8 606-WS 21 3/4 in / 553 mm 14 602A 56 9/16 in / 1437 mm 6 609 94 1/4 in / 2394 mm 4 602B 29 7/16 in / 748 mm 12 610 94 3/8 in / 2397 mm 2 6
(GRA-ELI-8A) 8x8 GRANDIO ELITE ALUMINUM PACKING LIST PARTS LIST FOR GRA-ELI-8A GRAPHIC PART NAME SIZE/LOCATION QUANTITY GRAPHIC PART NAME SIZE/LOCATION QUANTITY L08D 24 3/16 in / 614 mm 2 Z03 M3*25 4 L08A-X 52 1/4 in / 1327 mm 2 S02 M6*20 6 L08B-X 51 3/16 in / 1300 mm 2 ML01/S04 M6*14 150 L08C-X 61 1/32 in / 1550 mm 4 S05 SCREWS FOR WG01 AND WG02 M6*10 45 L08D-X 37 13/16 in / 960 mm 4 Z04, S04/ML01 ROOF VENT HARDWARE 4 L08E-X 38 11/16 in / 957 mm 4 HQC01 ROOF VEN
(GRA-ELI-8A) 8’x8’ GRANDIO ELITE ALUMINUM PACKING LIST PART NAME SIZE/LOCATION QUANTITY GRAPHIC PART NAME SIZE/LOCATION 10 QUANTITY 622-HNDL DOOR HANDLES 4 S10 M6*16 ATTACHES 619 TO BASE 10 622-HNDL NUT/BOLT DOOR HARDWARE 4 JG01 RIDGE END CAP 2 620 21 7/16 in / 545 mm 2 JG02 A/B MID ROOF END CAP 2/2 L21 95 1/2 in / 2425 mm 1 JG03 A/B GUTTER END CAP 2/2 J07 L21 END CAP 2 622 69 11/16 in / 1770 mm 2 622-L 69 11/16 in / 1770 mm 1 622-R 69 11/16 in / 1770 mm 1 623A 2
(GRA-ELI-8P) 8’x8’ ELITE PANEL BOX PACKING LIST PARTS LIST FOR GRA-ELI-8P GRAPHIC NAME SIZE/LOCATION WIDTH HEIGHT 1 HEIGHT 2 QTY Y1 FRONT & BACK PANEL 22 3/4 in / 578 mm 47 5/16 in / 1202 mm Y2-1 FRONT PANEL 22 3/4 in / 578 mm 9 1/16 in / 230 mm 23 in / 585 mm 1 Y2-2 FRONT PANEL 22 3/4 in / 578 mm 23 in / 585 mm 9 1/16 in / 230 mm 1 Y3-1 FRONT PANEL 35 1/2 in / 902 mm 9 15/16 in / 252 mm 19 1/8 in / 486 mm 1 Y3-2 FRONT PANEL 35 1/2 in / 902 mm 19 1/8 in / 486 mm 9 15/16 in
(GRA-ELI-4X) ELITE 4’ EXTENSION ALUMINUM PACKING LIST PART NAME SIZE/LOCATION QUANTITY 602A 56 9/16 in / 1437 mm 4 610 46 3/4 in / 1187 mm 2 602B 29 7/16 in / 748 mm 8 DP02 GUTTER BRACKET 2 603C 21 7/8 in / 555 m 1 DP02B GUTTER BRACKET 2 L08C-X / L08M-X 61 in / 1550 mm 2 630 46 3/4 in / 1187 mm 2 L08D-X 37 13/16 in / 960 mm 2 615 22 3/4 in / 578 mm 1 L08E-X 37 11/16 in / 957 mm 2 616 22 3/4 in / 578 mm 1 607 46 3/4 in / 1187 mm 1 618 19 11/16 in / 500 mm 1 607-XS
(GRA-ELI-4X) ELITE 4’ EXTENSION ALUMINUM PACKING LIST GRAPHIC PART NAME PARTS LIST FOR GRA-ELI-4X S07 SIZE/LOCATION QUANTITY M5*8 SCREW FOR DP02 AND DP02B 5 S08 M6*16 ATTACHES 607-XS TO 607 5 S09 M4*6 ATTACHES 609-XS TO 609 20 W04 CONNECTOR FOR 603C 2 W14 L08M-X BRACKET 2 W15 LARGE WASHER NOT FOR USE IN THIS UNIT 2 HQC01 ROOF VENT ARM 1 HQC02 ROOF VENT LATCH 1 Z04, S04/ML01 ROOF VENT HARDWARE 4 EACH 73
4X ELITE 4’ EXTENSION PANEL BOX PACKING LIST NAME SIZE/LOCATION WIDTH HEIGHT 1 HEIGHT 2 QTY Y7 SIDE WALL PANEL 22 3/4 in / 578 mm 57 in / 1447 mm 4 Y8 ROOF PANEL 22 3/4 in / 578 mm 30 5/8 in / 778 mm 3 Y9 UNDER ROOF VENT 22 3/4 in / 578 mm 8 7/8 in / 225 mm 2 Y10 ROOF VENT PANEL 22 3/4 in / 578 mm 19 1/8 in / 486 mm 1 Y11 ROOF PANEL 22 3/4 in / 578 mm 30 3/8 in / 772 mm 4 74 PARTS LIST FOR GRA-ELI-4X GRAPHIC
(GRA-ELI-8XA) ELITE 8’ EXTENSION ALUMINUM PACKING LIST PARTS LIST FOR GRA-ELI-8XA GRAPHIC GRAPHIC PART NAME SIZE/LOCATION QUANTITY PART NAME SIZE/LOCATION QUANTITY 602A 56 9/16 in / 1437 mm 8 610 94 1/4 in / 2374 mm 2 602B 29 7/16 in / 748 mm 16 DP02 GUTTER BRACKET 2 603C 21 7/8 in / 555 m 2 DP02B GUTTER BRACKET 2 L08C-X / L08M-X 61 in / 1550 mm 2 630 93 7/16 in / 2374 mm 2 L08D-X 37 13/16 in / 960 mm 2 615 22 3/4 in / 578 mm 2 L08E-X 37 11/16 in / 957 mm 2 616 22
(GRA-ELI-8XA) 8X GRANDIO ELITE ALUMINUM PACKING LIST PART NAME S07 SIZE/LOCATION M5*8 SCREW FOR DP02 AND DP02B QUANTITY 5 S08 M6*16 ATTACHES 607-XS TO 607 5 S09 M4*6 ATTACHES 609-XS TO 609 20 W04 CONNECTOR FOR 603C 4 W14 L08M-X BRACKET 2 W15 LARGE WASHER NOT USED IN THE UNIT 2 HQC01 ROOF VENT ARM 2 HQC02 ROOF VENT LATCH 2 Z04, S04/ML01 ROOF VENT HARDWARE 4 PARTS LIST FOR GRA-ELI-8XA GRAPHIC 76
(GRA-ELI-8XP) GRANDIO ELITE 8 EXTENSION PANEL BOX PACKING LIST PARTS LIST FOR GRA-ELI-8XP GRAPHIC NAME SIZE/LOCATION WIDTH HEIGHT 1 HEIGHT 2 QTY Y7 SIDE WALL PANEL 22 3/4 in / 578 mm 57 in / 1447 mm 8 Y8 ROOF PANEL 22 3/4 in / 578 mm 30 5/8 in / 778 mm 6 Y9 UNDER ROOF VENT 22 3/4 in / 578 mm 8 7/8 in / 225 mm 2 Y10 ROOF VENT PANEL 22 3/4 in / 578 mm 19 1/8 in / 486 mm 2 Y11 ROOF PANEL 22 3/4 in / 578 mm 30 3/8 in / 772 mm 8 77
GRAPHIC PART NAME SIZE/LOCATION QUANTITY 603D 72 3/16 in / 1833 mm SIZE/LOCATION QUANTITY 1 Z01 M4*30 SCREWS FOR DOORS 13 603E 18 1/4 in / 463 mm 1 ML01/S04 M6*10 35 70 3/4 in / 1797 mm 1 ML01/S02 M6*20 4 604L 70 3/4 in / 1797 mm 1 L21 95 1/2 in / 2425 mm 1 L08D 24 3/16 in / 614 mm 2 J07 L21 ENDCAP 2 619 94 1/4 in / 2394 mm 1 L28 19 9/16 in / 497 mm FRONT RIGHT 2 622 69 11/16 in / 1770 mm 2 W04 CONNECTOR BRACKET 1 622R 69 11/16 in / 1770 mm 1 W04-1 FRAME CO
Grandio Greenhouse Limited Lifetime Warranty 1. Grandio Greenhouses are warranted to the original purchaser to be free from defects in material or workmanship for ten years from the date of original retail purchase on all plastic panels. Additionally the aluminium frame is warranted for life. The word “defects” is defined as imperfections that impair the use of the product. WARRANTY 2. Defects resulting from misuse, abuse or negligence will void this warranty.
NOTES NOTES
GRANDIO G R E E N H O U S E S 2015 Grandio Elite 8x12, 8x16, 8x20 & 8x24 Models GREENHOUSE USER MANUAL KEEP IN A SAFE PLACE FOR REFERENCE CONTACT US IF YOU NEED HELP OR HAVE MISSING OR DAMAGED PARTS GRANDIOGREENHOUSES.COM BACKYARD LIVING SOURCE, INC. 9543 W. EMERALD ST.