Full Product Manual

GrandPrix Two-Post Lifts 19 P/N 5900209Rev. D3 Feb. 2020
Putting in Chalk Line Guides
Based on the specifications for your Lift, create Chalk Line Guides on the ground for the two posts
prior to moving them into position.
Use the Width Overall value in Specifications
for your Lift model
to determine where to place
the Chalk Line Guides. The Width Overall value is defined as the distance from the back of one base
plate to the back of the other base plate.
To add Chalk Line Guides:
1. Decide where you want to locate the Lift.
2. Create an alignment chalk line at the desired location.
The alignment chalk line must be longer than the Width Overall setting for your Lift model.
3. Create two perpendicular chalk lines at 90° angles to the alignment chalk lines.
The two perpendicular chalk lines must be x distance from each other, where x is the Width
Overall setting for your Lift model.
4. When you move the posts into position, put the corners of the base plates into the corners created
by the Chalk Line Guides.