Full Product Manual

GrandPrix Two-Post Lifts 41 P/N 5900209Rev. D3 Feb. 2020
2. Remove the plastic plugs from the appropriate ports on the Power Unit: the Hydraulic Return port
(left
rear
connector) and the Hydraulic Power Out port (right
front
connector).
3. For the Hydraulic Return port, install a 90° hydraulic fitting. Connect that 90° fitting to the fitting on
the bottom of the Hydraulic Return Line.
4. For the Hydraulic Power Out port, connect a 90° ORB fitting. Connect that 90° ORB fitting to the
fitting on the bottom of the Hydraulic Power Line.
If desired, use liquid thread sealant on the NPT threads. Do not use thread seal tape.
5. In the Top Trough, install a straight JIC fitting to the to the end of each Hydraulic Hose, then install
Flare Fittings to the end of each Hydraulic Line.
6. Connect the Hydraulic Hoses to the corresponding Hydraulic Lines.
7. When the two metal Hydraulic Lines are connected to the Power Unit and the flexible Hydraulic
Hoses, fix them in place using the Pipe Straps on the side of the Powerside Post.