Full Product Manual

EZ Pitched Roof System
23 of 30
Installation Instructions:
EZ Metal Roof Mount Kit K20051-XXX
1. From the marked location drill the pilot hole for the Lag
Bolt with a 7/32” drill bit. For maximum strength, the
hole should not be more than 3 in depth, and a drill
stop may be used to insure this.
2. To ensure a strong and water tight seal, wipe away
excess grease or debris from the mounting location.
Fill pilot hole with sealant, such as ChemLink DuraLink
for metal roofs. Install AL Shoe to Metal Roof by using
5/16” Lag Bolt. Tighten to 25 ft. lbs. torque.
3. Install L-Foot to AL Shoe and lightly hand tighten Hex
Cap.
4. Install AL Rail to L-Foot to the specific orientation.
Then, tighten 3/8” Flange Nut to 15 ft-lbs. and Hex Cap
to 15 ft-lbs. torque.
2
4
1
3