Installation Guide
INSTALLATION BASICS
  Leave a minimum of 1/8" clearance at all openings and stops 
  to allow for normal expansion and contraction. When installing 
  in temperatures below 40° F/4.4° C, increase minimum 
  clearance to 3/8" (9.5mm).
  When lapping panels, leave 1/8" gap at nailing hem (FIG 1).
  When installing a siding panel, push up from the bottom until 
  the lock is fully engaged with the piece below it. The panels 
  should not be under tension or compression when they are fastened. 
  Allow the butt edge to rest on the top edge of the course below (FIG 2).
  Do not drive the head of the fastener tightly against the nail hem. Allow clearance     
  between the fastener head and the siding nail hem (approx. 1/32"). Drive fasteners     
  straight and level to prevent any restriction of the panel. Nail panels every 10".
  Grayne Panel Fastener: 3/8" (9.5mm) Head with .120" (3mm) Shank, fastener must    
  penetrate 3/4" (19mm) beyond solid substrate. Kleer Trim Fasteners: Recommended 
  Cortex system, optional using 6d & 8d stainless steel or hot-dipped galvanized nails 
  12" on-center and approximatly 3/4" (19mm) from each edge. Use the proper quantity   
  and size of fasteners that will penetrate the substrate at least 1-1/2". Refer to trim 
  manufacturing guide for additional installations techniques.
1/8"
FIGURE 1
FIGURE 2
1. Align panels
2. Engage lock
3. Press upward 
  to fully engage
4. Let top panel rest 
  on panel below
4










