Installation Guide
DUAL OFFSET INSTALLATION METHOD
  Dual offset installation methods 
  ensures shingles will have proper 
  “side laps”.
  When starting a course, panels will 
  be cut between the “cut marks”.
  The installed course should always 
  end on the “panel end mark” 
  of the course below.
  Alternate between square and triangle cuts for the rst course on the wall, 
  this will ensure proper “side laps” for the entire installation.
6
y
y
Å
Left Side End of Wall
▲
Correct Installation Incorrect Installation
Square Triangle
This feature is useful around windows and doors










