Instructions / Assembly

4.
1. Inspect ramp periodically for damage, loose fasteners, loose hinges, and corrosion.
DO NOT use the ramp if the ramp is damaged in any manner.
2. Lubricate the hinges and adjustable sleeves annually with a lightweight oil.
MODEL 46827 WITH CLOSED SURFACE DESIGN
OPTION:
QTY.I
TEM
1
3
16
" Drill Bit
6 2" No. 10 Machine Screws
6 Lock Washers
6 Nuts
1 Wrench
1 Screw Driver
Plywood thickness
1
4
" maximum, Plywood Dimensions:
13
7
16
" × 76
1
4
"
1. On the second tread from the bottom of the ramp,
drill two
3
16
" holes thru plywood and tread. The hole
location should be
1
2
" from the inside of each vertical
rail channel and in the center of the tread.
2. Now secure the plywood with the 2" No. 10 machine screws, lock washer and nut.
3. Repeat step 1 and 2 for the remaining two panels.
For more information about this or other products, contact us at:
Great Day, Inc.
P.O. Box 472
Tallulah, LA 71284
1-318-574-5003
1-866-645-1918
www.greatdayinc.com
An IPM Enterprise
Maintenance
/Care
Hardware
Needed
Plywood
Insert
NOTE: PLYWOOD AND HARDWARE
ARE NOT INCLUDED.
VERTICAL RAIL
DRILL HOLES
46724 great day install ins.qxd 8/7/03 1:49 PM Page 4