User Manual

Great Plains Mfg., Inc.
6 Opener Stop Update
221-646M 04/02/2009
Re-Route Wing Seed Hose
Refer to Figure 9
14. Cut the wing tower primary hose out of any tie
wraps back to the welded loop at the wing fold point.
15. Re-route the hose along the rear outside of the wing
as shown in Figure 9.
16. Re-connect the hose to the re-positioned tower
inlets and secure with hose clamp.
17. Secure it to the frame using three ties on each wing.
Close-Out
Raise openers. Raise drill. Slowly fold the wings, check-
ing for any clearance problems. Fold and unfold the
wings several times to verify.
Drill Operation
This update causes no changes to drill operations.
Drill Maintenance
This update causes no changes to drill maintenance.
TOWER 1
TOWER 2
TOWER 4
TOWER 5
TOWER 3
22¾ in
57.8 cm
22¾ in
57.8 cm
Figure 9
New Primary Hose Route for Wings
29462
L
R
B
F
Secure
hose with
cable ties
Secure
hose with
cable ties