Installation Guide

START-UP
14
5.2 Start-Up Report…………………………………………………………………
COMPLETE SECTIONS BELOW AND KEEP FOR FUTURE REFERENCE
Product Information
Installation Date:
Indoor Model No:
Indoor Serial No:
Outdoor Model No:
Outdoor Serial No:
Installer Information
Contractor Company:
Contractor Name:
Operating Data
Cooling
Heating
Power Supply (At Indoor Unit)
L1 to Ground:
L2 to Ground:
L1 to L2:
Low Voltage (At Indoor Unit)
R to C terminals:
Amps
Blower Motor:
Electric Heater (If installed):
Airflow
Supply External Static Pressure:
Return External Static Pressure:
Total External Static Pressure:
Temperature
Setpoint at thermostat:
Supply Air:
Return Air:
Indoor Ambient:
It is the licensed HVAC installing contractors responsibility to provide the homeowner/end
user with instruction and training on how to operate the system in cooling and heating
from the field supplied/installed thermostat.