Installation & Assembly

Engineered Flooring
Glue Down Installation
GLUE DOWN INSTRUCTIONS
ATTENTION
Inspect ALL materials carefully BEFORE installation. Warranties DO NOT cover
materials that are installed with visible defects.
It is the responsibility of the installer/owner to determine if the job site Subfloor and
job site conditions are environmentally and structurally acceptable for wood floor
installation. Flooring manufacturer declines any responsibility for wood floor failure
resulting from or connected with subfloor, subsurface, job site damage or
deficiencies after hardwood flooring has been installed.
GLUE DOWN INSTALLATION
ADHESIVE: Using an appropriate, quality urethane adhesive is recommended.
TOOLS: The required tools for installation of these products include a hammer,
hand power saw, chalk line, wood floor adhesive and recommended trowel.
Recommended Trowel: General ½” thick wood floor should use 3/16” wide 5/32”
deep v-notch trowel to yield approximately 45 to 50 sq. ft. per gallon or ¼” x ¼” x
3/16”square notch. 5/16” thick wood flooring should use 3/16” x ¼” x ½” contour
v-notch to yield 60 sq. ft. per gallon. Follow adhesive manufacturer’s guidelines.
General Installation Instruction:
Time at which to install hardwood flooring: Lay only after sheetrock and tile work
are thoroughly dried and all but the final woodwork and trim have been completed.
The building interior should have been dried and seasoned and comfortable
working temperature (at least 60°F) should exist during installation.
Preparation of subfloor:
Subfloor irregularities and undulation may cause any wood floor installation to
develop hollow spots between the flooring and subfloor. These hollow spots are
NOT the result of any wood floor manufacturing defect and are NOT covered by
the flooring manufacturer warranty.
As part of your subfloor preparation remove any existing base, shoe mold or
doorway thresholds. These items can be replaced after installation, but should be
replaced in such a way as to allow at least ¼” room for expansion around the
perimeter of the room. All door casings should be notched out or undercut to allow
for ¼” room expansion and to avoid difficult scribe cuts. This is easily done by
placing a piece of the engineered product on the subfloor as a height guide for your
handsaw or jamb saw.
Note: Normal expansion space around the room should be the same distance as
the thickness of the hardwood flooring.
Thoroughly clean subfloor:
Remove paint, wax, oil, plaster, “sheetrock mud” and other foreign materials, as
well as obvious surface irregularities. #3-1/2 grit open coat paper may need to be
used to grind a concrete subfloor. This will loosen any dirt, loose concrete or
contaminates. Sweep or vacuum thoroughly. All previous or existing glues or
adhesives must be removed before installing new hardwood floor. Concrete
subfloors must be clean, flat, sound and sufficient compression strength (3000 lbs.
P.S.I.) being sure that the surface is NOT slick.
Sections not flat due to waviness, trowel marks, etc. are to be flattened by grinding
or the use of leveling compound. Especially along the walls, the subfloor flatness
must be checked and if necessary improved. Flatten to 3/16” in 10’ radius. In
addition to cement subfloors, these wood flooring products can be installed over
dry, flat subfloors such as plywood. No Particle board.
Time at which to install hardwood flooring: Lay only after sheetrock and tile work
are thoroughly dried and all but the final woodwork and trim have been completed.
The building interior should have been dried and seasoned and a comfortable
working temperature (at least 60° F) and a relative humidity of 35 – 55% should
exist during installation. If subfloor is concrete, check for dryness see below. If
moisture is present, do not lay. All concrete subfloors on or below grade need to be
tested.
Concrete subfloor Moisture Testing:
Electrical Impedance Test and Electrical Resistance Test (Concrete Moisture
Meters) Follow Moisture Meter MFG Guidelines. If Meter shows possibility of
excess moisture further testing is required. Calcium Chloride Test. See below.
Relative Humidity Test (Standard test method for determining relative humidity on
concrete floor slabs using Situ Probes. If test shows over 75% vapor retarder must
be used or wait for further curing.
Calcium Chloride Test ASTM F-1869 Readings over 3 lbs and up to 7 lbs vapor
retarder needed.
See NWFA installation guidelines chapter 3 Moisture Testing for full information of
testing.
Check floor in several locations. Consult with your local flooring distributor for
graphical variances.
Note: Normal expansion space around the room should be the same distance as
the thickness of the hardwood flooring.
The use of flooring putty to cover small cracks or face nail holes should
be considered normal in hardwood flooring installation.
New wood type subfloors should also be checked for moisture using a moisture
meter. In general, wood or plywood subfloors should not exceed 14% moisture
content and no more than 4% MC difference between wood flooring and subfloor.
Check with your local distributor for your geographical variances. If the plywood is
used as an overlay over the existing subfloor, the thickness of the overlay material
must be such as to yield a total ¾” subfloor thickness.
Suggested Layout Working Line: EXAMPLE: For 3” Material, snap a chalk line
30 ¼” from the wall on the door side of the room. The small area will be your
working space and the last to be installed. Temporarily nail straight board on chalk
line.
Caution: Proper humidity must be controlled between 35 – 55% for successful
performance before, during and after installation.
Installing the floor:
The floor should be installed from several cartons at the same time to
ensure color and shade mix.
End joints should never be closer than 4 inches from each other.
Install tongue into groove.
Tongue and groove should be engaged by hand.
Lift a plank periodically to check adhesive transfer.
Remove nailed board and install remainder of flooring.
Install base and mould after floor installation.
Clean adhesive off surface of wood with cleaner and soft cloth. (see
adhesive manufacturer’s recommendations)
For Unfinished Products
Do not start sanding product until adhesive has cured.
Radiant heat subfloors – See below.
Concrete or Plywood: Radiant Heat (Oak ONLY)
Radiant Heat Subfloors on or above grade.
The maximum temperature of subfloor under normal use should not
exceed 80°F (Check with heat system manufacturer.)
For correct water temperature inside heating pipes, check with
manufacturer’s suggested guidelines.
Heating pipes must be covered with 1 ¼” of concrete or minimum of
1/8” below bottom side of plywood subfloor.
Before installation of hardwood flooring, heat system must be operated
at normal living temperature for a minimum of 14 days. One to two
days before the flooring is laid, switch off heating unit. (At time of
installation, subfloor should be 64°F to 68°F)
Room temperature should not vary more than 15°F season to season.
Flooring manufacturer approved systems must not exceed 8 watts per
square foot heating.
3/8" 1/2"
10mm 12.7mm
INSTALLATION INSTRUCTIONS
Gen-E-25
(11/7/16)
GEN-E-25 12/8/17
INSTALLATION INSTRUCTIONS
9/16”
14.2mm
5/8”
15.8mm
Engineered Flooring
Glue Down Installation
GLUE DOWN INSTRUCTIONS
ATTENTION
Inspect ALL materials carefully BEFORE installation. Warranties DO NOT cover
materials that are installed with visible defects.
It is the responsibility of the installer/owner to determine if the job site Subfloor and
job site conditions are environmentally and structurally acceptable for wood floor
installation. Flooring manufacturer declines any responsibility for wood floor failure
resulting from or connected with subfloor, subsurface, job site damage or
deficiencies after hardwood flooring has been installed.
GLUE DOWN INSTALLATION
ADHESIVE: Using an appropriate, quality urethane adhesive is recommended.
TOOLS: The required tools for installation of these products include a hammer,
hand power saw, chalk line, wood floor adhesive and recommended trowel.
Recommended Trowel: General ½” thick wood floor should use 3/16” wide 5/32”
deep v-notch trowel to yield approximately 45 to 50 sq. ft. per gallon or ¼” x ¼” x
3/16”square notch. 5/16” thick wood flooring should use 3/16” x ¼” x ½” contour
v-notch to yield 60 sq. ft. per gallon. Follow adhesive manufacturer’s guidelines.
General Installation Instruction:
Time at which to install hardwood flooring: Lay only after sheetrock and tile work
are thoroughly dried and all but the final woodwork and trim have been completed.
The building interior should have been dried and seasoned and comfortable
working temperature (at least 60°F) should exist during installation.
Preparation of subfloor:
Subfloor irregularities and undulation may cause any wood floor installation to
develop hollow spots between the flooring and subfloor. These hollow spots are
NOT the result of any wood floor manufacturing defect and are NOT covered by
the flooring manufacturer warranty.
As part of your subfloor preparation remove any existing base, shoe mold or
doorway thresholds. These items can be replaced after installation, but should be
replaced in such a way as to allow at least ¼ room for expansion around the
perimeter of the room. All door casings should be notched out or undercut to allow
for ¼ room expansion and to avoid difficult scribe cuts. This is easily done by
placing a piece of the engineered product on the subfloor as a height guide for your
handsaw or jamb saw.
Note: Normal expansion space around the room should be the same distance as
the thickness of the hardwood flooring.
Thoroughly clean subfloor:
Remove paint, wax, oil, plaster, sheetrock mud and other foreign materials, as
well as obvious surface irregularities. #3-1/2 grit open coat paper may need to be
used to grind a concrete subfloor. This will loosen any dirt, loose concrete or
contaminates. Sweep or vacuum thoroughly. All previous or existing glues or
adhesives must be removed before installing new hardwood floor. Concrete
subfloors must be clean, flat, sound and sufficient compression strength (3000 lbs.
P.S.I.) being sure that the surface is NOT slick.
Sections not flat due to waviness, trowel marks, etc. are to be flattened by grinding
or the use of leveling compound. Especially along the walls, the subfloor flatness
must be checked and if necessary improved. Flatten to 3/16 in 10 radius. In
addition to cement subfloors, these wood flooring products can be installed over
dry, flat subfloors such as plywood. No Particle board.
Time at which to install hardwood flooring: Lay only after sheetrock and tile work
are thoroughly dried and all but the final woodwork and trim have been completed.
The building interior should have been dried and seasoned and a comfortable
working temperature (at least 60° F) and a relative humidity of 35 55% should
exist during installation. If subfloor is concrete, check for dryness see below. If
moisture is present, do not lay. All concrete subfloors on or below grade need to be
tested.
Concrete subfloor Moisture Testing:
Electrical Impedance Test and Electrical Resistance Test (Concrete Moisture
Meters) Follow Moisture Meter MFG Guidelines. If Meter shows possibility of
excess moisture further testing is required. Calcium Chloride Test. See below.
Relative Humidity Test (Standard test method for determining relative humidity on
concrete floor slabs using Situ Probes. If test shows over 75% vapor retarder must
be used or wait for further curing.
Calcium Chloride Test ASTM F-1869 Readings over 3 lbs and up to 7 lbs vapor
retarder needed.
See NWFA installation guidelines chapter 3 Moisture Testing for full information of
testing.
Check floor in several locations. Consult with your local flooring distributor for
graphical variances.
Note: Normal expansion space around the room should be the same distance as
the thickness of the hardwood flooring.
The use of flooring putty to cover small cracks or face nail holes should
be considered normal in hardwood flooring installation.
New wood type subfloors should also be checked for moisture using a moisture
meter. In general, wood or plywood subfloors should not exceed 14% moisture
content and no more than 4% MC difference between wood flooring and subfloor.
Check with your local distributor for your geographical variances. If the plywood is
used as an overlay over the existing subfloor, the thickness of the overlay material
must be such as to yield a total ¾” subfloor thickness.
Suggested Layout Working Line: EXAMPLE: For 3” Material, snap a chalk line
30 ¼” from the wall on the door side of the room. The small area will be your
working space and the last to be installed. Temporarily nail straight board on chalk
line.
Caution: Proper humidity must be controlled between 35 55% for successful
performance before, during and after installation.
Installing the floor:
The floor should be installed from several cartons at the same time to
ensure color and shade mix.
End joints should never be closer than 4 inches from each other.
Install tongue into groove.
Tongue and groove should be engaged by hand.
Lift a plank periodically to check adhesive transfer.
Remove nailed board and install remainder of flooring.
Install base and mould after floor installation.
Clean adhesive off surface of wood with cleaner and soft cloth. (see
adhesive manufacturer’s recommendations)
For Unfinished Products
Do not start sanding product until adhesive has cured.
Radiant heat subfloors See below.
Concrete or Plywood: Radiant Heat (Oak ONLY)
Radiant Heat Subfloors on or above grade.
The maximum temperature of subfloor under normal use should not
exceed 80°F (Check with heat system manufacturer.)
For correct water temperature inside heating pipes, check with
manufacturer’s suggested guidelines.
Heating pipes must be covered with 1 ¼” of concrete or minimum of
1/8” below bottom side of plywood subfloor.
Before installation of hardwood flooring, heat system must be operated
at normal living temperature for a minimum of 14 days. One to two
days before the flooring is laid, switch off heating unit. (At time of
installation, subfloor should be 64°F to 68°F)
Room temperature should not vary more than 15°F season to season.
Flooring manufacturer approved systems must not exceed 8 watts per
square foot heating.
3/8" 1/2"
10mm 12.7mm
INSTALLATION INSTRUCTIONS
Gen-E-25
(11/7/16)
Engineered Flooring
Glue Down Installation
GLUE DOWN INSTRUCTIONS
ATTENTION
Inspect ALL materials carefully BEFORE installation. Warranties DO NOT cover
materials that are installed with visible defects.
It is the responsibility of the installer/owner to determine if the job site Subfloor and
job site conditions are environmentally and structurally acceptable for wood floor
installation. Flooring manufacturer declines any responsibility for wood floor failure
resulting from or connected with subfloor, subsurface, job site damage or
deficiencies after hardwood flooring has been installed.
GLUE DOWN INSTALLATION
ADHESIVE: Using an appropriate, quality urethane adhesive is recommended.
TOOLS: The required tools for installation of these products include a hammer,
hand power saw, chalk line, wood floor adhesive and recommended trowel.
Recommended Trowel: General ½” thick wood floor should use 3/16” wide 5/32”
deep v-notch trowel to yield approximately 45 to 50 sq. ft. per gallon or ¼” x ¼” x
3/16”square notch. 5/16” thick wood flooring should use 3/16” x ¼” x ½” contour
v-notch to yield 60 sq. ft. per gallon. Follow adhesive manufacturer’s guidelines.
General Installation Instruction:
Time at which to install hardwood flooring: Lay only after sheetrock and tile work
are thoroughly dried and all but the final woodwork and trim have been completed.
The building interior should have been dried and seasoned and comfortable
working temperature (at least 60°F) should exist during installation.
Preparation of subfloor:
Subfloor irregularities and undulation may cause any wood floor installation to
develop hollow spots between the flooring and subfloor. These hollow spots are
NOT the result of any wood floor manufacturing defect and are NOT covered by
the flooring manufacturer warranty.
As part of your subfloor preparation remove any existing base, shoe mold or
doorway thresholds. These items can be replaced after installation, but should be
replaced in such a way as to allow at least ¼ room for expansion around the
perimeter of the room. All door casings should be notched out or undercut to allow
for ¼ room expansion and to avoid difficult scribe cuts. This is easily done by
placing a piece of the engineered product on the subfloor as a height guide for your
handsaw or jamb saw.
Note: Normal expansion space around the room should be the same distance as
the thickness of the hardwood flooring.
Thoroughly clean subfloor:
Remove paint, wax, oil, plaster, sheetrock mud and other foreign materials, as
well as obvious surface irregularities. #3-1/2 grit open coat paper may need to be
used to grind a concrete subfloor. This will loosen any dirt, loose concrete or
contaminates. Sweep or vacuum thoroughly. All previous or existing glues or
adhesives must be removed before installing new hardwood floor. Concrete
subfloors must be clean, flat, sound and sufficient compression strength (3000 lbs.
P.S.I.) being sure that the surface is NOT slick.
Sections not flat due to waviness, trowel marks, etc. are to be flattened by grinding
or the use of leveling compound. Especially along the walls, the subfloor flatness
must be checked and if necessary improved. Flatten to 3/16 in 10 radius. In
addition to cement subfloors, these wood flooring products can be installed over
dry, flat subfloors such as plywood. No Particle board.
Time at which to install hardwood flooring: Lay only after sheetrock and tile work
are thoroughly dried and all but the final woodwork and trim have been completed.
The building interior should have been dried and seasoned and a comfortable
working temperature (at least 60° F) and a relative humidity of 35 55% should
exist during installation. If subfloor is concrete, check for dryness see below. If
moisture is present, do not lay. All concrete subfloors on or below grade need to be
tested.
Concrete subfloor Moisture Testing:
Electrical Impedance Test and Electrical Resistance Test (Concrete Moisture
Meters) Follow Moisture Meter MFG Guidelines. If Meter shows possibility of
excess moisture further testing is required. Calcium Chloride Test. See below.
Relative Humidity Test (Standard test method for determining relative humidity on
concrete floor slabs using Situ Probes. If test shows over 75% vapor retarder must
be used or wait for further curing.
Calcium Chloride Test ASTM F-1869 Readings over 3 lbs and up to 7 lbs vapor
retarder needed.
See NWFA installation guidelines chapter 3 Moisture Testing for full information of
testing.
Check floor in several locations. Consult with your local flooring distributor for
graphical variances.
Note: Normal expansion space around the room should be the same distance as
the thickness of the hardwood flooring.
The use of flooring putty to cover small cracks or face nail holes should
be considered normal in hardwood flooring installation.
New wood type subfloors should also be checked for moisture using a moisture
meter. In general, wood or plywood subfloors should not exceed 14% moisture
content and no more than 4% MC difference between wood flooring and subfloor.
Check with your local distributor for your geographical variances. If the plywood is
used as an overlay over the existing subfloor, the thickness of the overlay material
must be such as to yield a total ¾” subfloor thickness.
Suggested Layout Working Line: EXAMPLE: For 3” Material, snap a chalk line
30 ¼” from the wall on the door side of the room. The small area will be your
working space and the last to be installed. Temporarily nail straight board on chalk
line.
Caution: Proper humidity must be controlled between 35 55% for successful
performance before, during and after installation.
Installing the floor:
The floor should be installed from several cartons at the same time to
ensure color and shade mix.
End joints should never be closer than 4 inches from each other.
Install tongue into groove.
Tongue and groove should be engaged by hand.
Lift a plank periodically to check adhesive transfer.
Remove nailed board and install remainder of flooring.
Install base and mould after floor installation.
Clean adhesive off surface of wood with cleaner and soft cloth. (see
adhesive manufacturer’s recommendations)
For Unfinished Products
Do not start sanding product until adhesive has cured.
Radiant heat subfloors See below.
Concrete or Plywood: Radiant Heat (Oak ONLY)
Radiant Heat Subfloors on or above grade.
The maximum temperature of subfloor under normal use should not
exceed 80°F (Check with heat system manufacturer.)
For correct water temperature inside heating pipes, check with
manufacturer’s suggested guidelines.
Heating pipes must be covered with 1 ¼” of concrete or minimum of
1/8” below bottom side of plywood subfloor.
Before installation of hardwood flooring, heat system must be operated
at normal living temperature for a minimum of 14 days. One to two
days before the flooring is laid, switch off heating unit. (At time of
installation, subfloor should be 64°F to 68°F)
Room temperature should not vary more than 15°F season to season.
Flooring manufacturer approved systems must not exceed 8 watts per
square foot heating.
3/8" 1/2"
10mm 12.7mm
INSTALLATION INSTRUCTIONS
Gen-E-25
(11/7/16)
Engineered Flooring
Glue Down Installation
GLUE DOWN INSTRUCTIONS
ATTENTION
Inspect ALL materials carefully BEFORE installation. Warranties DO NOT cover
materials that are installed with visible defects.
It is the responsibility of the installer/owner to determine if the job site Subfloor and
job site conditions are environmentally and structurally acceptable for wood floor
installation. Flooring manufacturer declines any responsibility for wood floor failure
resulting from or connected with subfloor, subsurface, job site damage or
deficiencies after hardwood flooring has been installed.
GLUE DOWN INSTALLATION
ADHESIVE: Using an appropriate, quality urethane adhesive is recommended.
TOOLS: The required tools for installation of these products include a hammer,
hand power saw, chalk line, wood floor adhesive and recommended trowel.
Recommended Trowel: General ½” thick wood floor should use 3/16” wide 5/32”
deep v-notch trowel to yield approximately 45 to 50 sq. ft. per gallon or ¼” x ¼” x
3/16”square notch. 5/16” thick wood flooring should use 3/16” x ¼” x ½” contour
v-notch to yield 60 sq. ft. per gallon. Follow adhesive manufacturer’s guidelines.
General Installation Instruction:
Time at which to install hardwood flooring: Lay only after sheetrock and tile work
are thoroughly dried and all but the final woodwork and trim have been completed.
The building interior should have been dried and seasoned and comfortable
working temperature (at least 60°F) should exist during installation.
Preparation of subfloor:
Subfloor irregularities and undulation may cause any wood floor installation to
develop hollow spots between the flooring and subfloor. These hollow spots are
NOT the result of any wood floor manufacturing defect and are NOT covered by
the flooring manufacturer warranty.
As part of your subfloor preparation remove any existing base, shoe mold or
doorway thresholds. These items can be replaced after installation, but should be
replaced in such a way as to allow at least ¼ room for expansion around the
perimeter of the room. All door casings should be notched out or undercut to allow
for ¼ room expansion and to avoid difficult scribe cuts. This is easily done by
placing a piece of the engineered product on the subfloor as a height guide for your
handsaw or jamb saw.
Note: Normal expansion space around the room should be the same distance as
the thickness of the hardwood flooring.
Thoroughly clean subfloor:
Remove paint, wax, oil, plaster, sheetrock mud and other foreign materials, as
well as obvious surface irregularities. #3-1/2 grit open coat paper may need to be
used to grind a concrete subfloor. This will loosen any dirt, loose concrete or
contaminates. Sweep or vacuum thoroughly. All previous or existing glues or
adhesives must be removed before installing new hardwood floor. Concrete
subfloors must be clean, flat, sound and sufficient compression strength (3000 lbs.
P.S.I.) being sure that the surface is NOT slick.
Sections not flat due to waviness, trowel marks, etc. are to be flattened by grinding
or the use of leveling compound. Especially along the walls, the subfloor flatness
must be checked and if necessary improved. Flatten to 3/16 in 10 radius. In
addition to cement subfloors, these wood flooring products can be installed over
dry, flat subfloors such as plywood. No Particle board.
Time at which to install hardwood flooring: Lay only after sheetrock and tile work
are thoroughly dried and all but the final woodwork and trim have been completed.
The building interior should have been dried and seasoned and a comfortable
working temperature (at least 60° F) and a relative humidity of 35 55% should
exist during installation. If subfloor is concrete, check for dryness see below. If
moisture is present, do not lay. All concrete subfloors on or below grade need to be
tested.
Concrete subfloor Moisture Testing:
Electrical Impedance Test and Electrical Resistance Test (Concrete Moisture
Meters) Follow Moisture Meter MFG Guidelines. If Meter shows possibility of
excess moisture further testing is required. Calcium Chloride Test. See below.
Relative Humidity Test (Standard test method for determining relative humidity on
concrete floor slabs using Situ Probes. If test shows over 75% vapor retarder must
be used or wait for further curing.
Calcium Chloride Test ASTM F-1869 Readings over 3 lbs and up to 7 lbs vapor
retarder needed.
See NWFA installation guidelines chapter 3 Moisture Testing for full information of
testing.
Check floor in several locations. Consult with your local flooring distributor for
graphical variances.
Note: Normal expansion space around the room should be the same distance as
the thickness of the hardwood flooring.
The use of flooring putty to cover small cracks or face nail holes should
be considered normal in hardwood flooring installation.
New wood type subfloors should also be checked for moisture using a moisture
meter. In general, wood or plywood subfloors should not exceed 14% moisture
content and no more than 4% MC difference between wood flooring and subfloor.
Check with your local distributor for your geographical variances. If the plywood is
used as an overlay over the existing subfloor, the thickness of the overlay material
must be such as to yield a total ¾” subfloor thickness.
Suggested Layout Working Line: EXAMPLE: For 3” Material, snap a chalk line
30 ¼” from the wall on the door side of the room. The small area will be your
working space and the last to be installed. Temporarily nail straight board on chalk
line.
Caution: Proper humidity must be controlled between 35 55% for successful
performance before, during and after installation.
Installing the floor:
The floor should be installed from several cartons at the same time to
ensure color and shade mix.
End joints should never be closer than 4 inches from each other.
Install tongue into groove.
Tongue and groove should be engaged by hand.
Lift a plank periodically to check adhesive transfer.
Remove nailed board and install remainder of flooring.
Install base and mould after floor installation.
Clean adhesive off surface of wood with cleaner and soft cloth. (see
adhesive manufacturer’s recommendations)
For Unfinished Products
Do not start sanding product until adhesive has cured.
Radiant heat subfloors See below.
Concrete or Plywood: Radiant Heat (Oak ONLY)
Radiant Heat Subfloors on or above grade.
The maximum temperature of subfloor under normal use should not
exceed 80°F (Check with heat system manufacturer.)
For correct water temperature inside heating pipes, check with
manufacturer’s suggested guidelines.
Heating pipes must be covered with 1 ¼” of concrete or minimum of
1/8” below bottom side of plywood subfloor.
Before installation of hardwood flooring, heat system must be operated
at normal living temperature for a minimum of 14 days. One to two
days before the flooring is laid, switch off heating unit. (At time of
installation, subfloor should be 64°F to 68°F)
Room temperature should not vary more than 15°F season to season.
Flooring manufacturer approved systems must not exceed 8 watts per
square foot heating.
3/8" 1/2"
10mm 12.7mm
INSTALLATION INSTRUCTIONS
Gen-E-25
(11/7/16)
Engineered Flooring
Glue Down Installation
GLUE DOWN INSTRUCTIONS
ATTENTION
Inspect ALL materials carefully BEFORE installation. Warranties DO NOT cover
materials that are installed with visible defects.
It is the responsibility of the installer/owner to determine if the job site Subfloor and
job site conditions are environmentally and structurally acceptable for wood floor
installation. Flooring manufacturer declines any responsibility for wood floor failure
resulting from or connected with subfloor, subsurface, job site damage or
deficiencies after hardwood flooring has been installed.
GLUE DOWN INSTALLATION
ADHESIVE: Using an appropriate, quality urethane adhesive is recommended.
TOOLS: The required tools for installation of these products include a hammer,
hand power saw, chalk line, wood floor adhesive and recommended trowel.
Recommended Trowel: General ½” thick wood floor should use 3/16” wide 5/32”
deep v-notch trowel to yield approximately 45 to 50 sq. ft. per gallon or ¼” x ¼” x
3/16”square notch. 5/16” thick wood flooring should use 3/16” x ¼” x ½” contour
v-notch to yield 60 sq. ft. per gallon. Follow adhesive manufacturer’s guidelines.
General Installation Instruction:
Time at which to install hardwood flooring: Lay only after sheetrock and tile work
are thoroughly dried and all but the final woodwork and trim have been completed.
The building interior should have been dried and seasoned and comfortable
working temperature (at least 60°F) should exist during installation.
Preparation of subfloor:
Subfloor irregularities and undulation may cause any wood floor installation to
develop hollow spots between the flooring and subfloor. These hollow spots are
NOT the result of any wood floor manufacturing defect and are NOT covered by
the flooring manufacturer warranty.
As part of your subfloor preparation remove any existing base, shoe mold or
doorway thresholds. These items can be replaced after installation, but should be
replaced in such a way as to allow at least ¼ room for expansion around the
perimeter of the room. All door casings should be notched out or undercut to allow
for ¼ room expansion and to avoid difficult scribe cuts. This is easily done by
placing a piece of the engineered product on the subfloor as a height guide for your
handsaw or jamb saw.
Note: Normal expansion space around the room should be the same distance as
the thickness of the hardwood flooring.
Thoroughly clean subfloor:
Remove paint, wax, oil, plaster, sheetrock mud and other foreign materials, as
well as obvious surface irregularities. #3-1/2 grit open coat paper may need to be
used to grind a concrete subfloor. This will loosen any dirt, loose concrete or
contaminates. Sweep or vacuum thoroughly. All previous or existing glues or
adhesives must be removed before installing new hardwood floor. Concrete
subfloors must be clean, flat, sound and sufficient compression strength (3000 lbs.
P.S.I.) being sure that the surface is NOT slick.
Sections not flat due to waviness, trowel marks, etc. are to be flattened by grinding
or the use of leveling compound. Especially along the walls, the subfloor flatness
must be checked and if necessary improved. Flatten to 3/16 in 10 radius. In
addition to cement subfloors, these wood flooring products can be installed over
dry, flat subfloors such as plywood. No Particle board.
Time at which to install hardwood flooring: Lay only after sheetrock and tile work
are thoroughly dried and all but the final woodwork and trim have been completed.
The building interior should have been dried and seasoned and a comfortable
working temperature (at least 60° F) and a relative humidity of 35 55% should
exist during installation. If subfloor is concrete, check for dryness see below. If
moisture is present, do not lay. All concrete subfloors on or below grade need to be
tested.
Concrete subfloor Moisture Testing:
Electrical Impedance Test and Electrical Resistance Test (Concrete Moisture
Meters) Follow Moisture Meter MFG Guidelines. If Meter shows possibility of
excess moisture further testing is required. Calcium Chloride Test. See below.
Relative Humidity Test (Standard test method for determining relative humidity on
concrete floor slabs using Situ Probes. If test shows over 75% vapor retarder must
be used or wait for further curing.
Calcium Chloride Test ASTM F-1869 Readings over 3 lbs and up to 7 lbs vapor
retarder needed.
See NWFA installation guidelines chapter 3 Moisture Testing for full information of
testing.
Check floor in several locations. Consult with your local flooring distributor for
graphical variances.
Note: Normal expansion space around the room should be the same distance as
the thickness of the hardwood flooring.
The use of flooring putty to cover small cracks or face nail holes should
be considered normal in hardwood flooring installation.
New wood type subfloors should also be checked for moisture using a moisture
meter. In general, wood or plywood subfloors should not exceed 14% moisture
content and no more than 4% MC difference between wood flooring and subfloor.
Check with your local distributor for your geographical variances. If the plywood is
used as an overlay over the existing subfloor, the thickness of the overlay material
must be such as to yield a total ¾” subfloor thickness.
Suggested Layout Working Line: EXAMPLE: For 3” Material, snap a chalk line
30 ¼” from the wall on the door side of the room. The small area will be your
working space and the last to be installed. Temporarily nail straight board on chalk
line.
Caution: Proper humidity must be controlled between 35 55% for successful
performance before, during and after installation.
Installing the floor:
The floor should be installed from several cartons at the same time to
ensure color and shade mix.
End joints should never be closer than 4 inches from each other.
Install tongue into groove.
Tongue and groove should be engaged by hand.
Lift a plank periodically to check adhesive transfer.
Remove nailed board and install remainder of flooring.
Install base and mould after floor installation.
Clean adhesive off surface of wood with cleaner and soft cloth. (see
adhesive manufacturer’s recommendations)
For Unfinished Products
Do not start sanding product until adhesive has cured.
Radiant heat subfloors See below.
Concrete or Plywood: Radiant Heat (Oak ONLY)
Radiant Heat Subfloors on or above grade.
The maximum temperature of subfloor under normal use should not
exceed 80°F (Check with heat system manufacturer.)
For correct water temperature inside heating pipes, check with
manufacturer’s suggested guidelines.
Heating pipes must be covered with 1 ¼” of concrete or minimum of
1/8” below bottom side of plywood subfloor.
Before installation of hardwood flooring, heat system must be operated
at normal living temperature for a minimum of 14 days. One to two
days before the flooring is laid, switch off heating unit. (At time of
installation, subfloor should be 64°F to 68°F)
Room temperature should not vary more than 15°F season to season.
Flooring manufacturer approved systems must not exceed 8 watts per
square foot heating.
3/8" 1/2"
10mm 12.7mm
INSTALLATION INSTRUCTIONS
Gen-E-25
(11/7/16)
Install this area last
Adhesive
Nail straight board
on chalk line
remove board later
Adhesive
Concrete or plywood type subfloors
Use this on engineered
Change this to appear as a
row/peaks in the glue - looks like
poop
Install this area last
Adhesive
Nail straight board
on chalk line
remove board later
Adhesive
Concrete or plywood type subfloors
Use this on engineered
Change this to appear as a
row/peaks in the glue - looks like
poop