Manual
Table Of Contents
- 1 Description
- 2 Important safety instructions
- 3 Symbols on the machine
- 4 Risk levels
- 5 Service
- 6 Environmentally safe battery disposal
- 7 Proposition 65
- 8 Installation
- 9 Operation
- 10 Maintenance
- 11 Transportation and storage
- 12 Troubleshooting
- 13 Technical data
- 14 Limited warranty
- 15 Exploded view
- 1 Descripción
- 2 Instrucciones importantes de seguridad
- 3 Símbolos en la máquina
- 4 Niveles de riesgo
- 5 Servicio
- 6 Eliminación de batería segura para el medio ambiente
- 7 Propuesta 65
- 8 Instalación
- 9 Funcionamiento
- 10 Mantenimiento
- 11 Transporte y almacenamiento
- 12 Solución de problemas
- 13 Datos técnicos
- 14 Garantía limitada
- 15 Vista despiezada
TRANSPORTATION CHARGES:
Transportation charges for the movement of any power
equipment unit or attachment are the responsibility of the
purchaser. It is the purchaser’s responsibility to pay
transportation charges for any part submitted for replacement
under this warranty unless such return is requested in writing
by Greenworks.
USA ADDRESS:
Greenworks Tools
P.O. Box 1238
Mooresville, NC 28115
15 EXPLODED VIEW
No. Part No. Qt
y
Description No. Part No. Qty Description
1 34105874 1 Auxiliary handle 7 34120186 1 Button
2 2101602 1 Bare tool assembly 8 3340646A 1 Spring
3 33306874 1 Metal ring 9 3220313-3 1 Screw
4 34116884AB 1 Auxiliary handle knob 10 31101724 1 Spool
13
English
EN