CONCETTO DESIGN + ENGINEERING GROHE GERMANY 99.0675.031/ÄM 236922/07.16 www.grohe.
1 I
5 016 35 033 29 102 2 1
1 2 3 p. 5-6 2. 1.
3mm 270° 4 I
1 3mm 2 3 0 . 1. 2.
4 5 1 10 1. Desired max. temperature 2. Température souhaitée max. 1 - 10 Deseada temperatura max. 6 7 1. 1 - 10 2.
1 3mm 2 9mm 17mm 7 1
3 4 5 8
English Français Español Flush piping system prior and after installation of faucet thoroughly! Bien rincer les canalisations avant et après l’installation! ¡Purgar a fondo el sistema de tuberías antes y después de la instalación! Winterizing the system Hivernisation du système It is recommended that the "pressure balancing cartridge" be removed from the valve casting if the system is to be shut off during the winter.