Instructions / Assembly

www.gronomics.com East Bethel, MN USA 763-753-7374
5
Bottom Board and Fabric Installation
Place one 22” x 5-1/2” corner notched bottom board (Item 3) on each
end of the garden bed.
Place six 22” x 5-1/2” bottom boards (Item 4) into the garden bed. (Gap
boards evenly to allow for water drainage).
Place fabric liner into the garden bed.
Soil Capacity: 4.7 Cubic Feet
3
End Rail Assembly
Install two 21” x 5-1/2” side rails (Item 5) into the slots and slide down to
the bottom of the slots.
4
Final Side Rail Assembly
Install two 45” x 5-1/2” side rails (Item 6) into the slots on each side of
the garden bed and slide down. (Side rail with Logo located to outside).
Install two 21” x 5-1/2” side rails (Item 5) into the slots on each end of the
garden bed and slide down.
5
5
5
6
5
Logo
6
3
4
6
Post Cap Assembly
Remove the rubber cap from the corner posts studs.
Align the hole of the 4” x 4” post cap (Item 2) with stud and tighten until
the cap makes contact with the post.
NOTE: Do not overtighten.
Repeat procedure on all posts.
Rubber Cap
Stud
2