Instructions / Assembly

East Bethel, MN USA 763-753-7374
Continued
Parts List
ITEM QTY. PART # DESCRIPTION
1 1 2001 Fabric Liner, 36” x 48”
2 4 3100 Post Cap, 4” x 4” x 1-1/2”
3 2 7026 Corner Notched Bottom Board, 31-7/8” x 5-1/2” x 1”
4 6 7025 Bottom Board, 31-7/8” x 5-1/2” x 1”
5 4 3101 Side Rail, 31” x 5-1/2” x 1”
6 2 3103 Side Rail Narrow Center, 31” x 2-1/2” x 1”
7 2 4502 Side Rail Narrow Center, 45” x 2-1/2” x 1”
8 2 7011 Side Rail w/Cleat, 45” x 5-1/2” x 1”
9 2 4501, 4501L Side Rail (one w/Logo), 45” x 5-1/2” x 1”
10 4 3201 Corner Post, 4” x 4” x 32”
1
Parts Identi cation
Stack matching pieces in piles. Using the parts list,
locate and count the individual pieces and verify that
you have received the correct number of pieces.
If any pieces are missing or replacement parts are
required, contact Gronomics at 1-855-299-6727.
NOTE: It is recommended to place a protective layer
between the ground and the pieces during assembly.
This will help prevent damage to the pieces.
Elevated Garden Bed (3 Tier 34” x 48”)
Assembly Instruction
ITEM #: EGB 34-48
iTEM #: EGB 34-48S
1
5
6
3
4
2
7
8 9
10
10
Side Rail Assembly
2
Stand two 4” x 4” x 32” corner posts (Item 10) upright with slots facing
each corner post and slots facing you.
Locate a 45” x 5-1/2” side rail w/cleat (Item 8). With cleat located at the
bottom and facing you, install side rail w/cleat into the slots and slide
down to the bottom of the slots.
Repeat procedure for the two remaining corner posts and 45” x 5-1/2”
side rail w/cleat.
(Soil depth option: Cleats located as shown will provide a soil depth of
approximately 10”. Reverse side rail w/cleat installation, cleats located at
top, if a soil depth of approximately 6” is desired.)
Cleat
10
10
10
10
8
Packaged & Inspected by: Date:

Summary of content (2 pages)