Instructions / Assembly

WWW.gronomics.com East Bethel, MN USA 763-753-7374
Place the two remaining 12" x 8.25" x 1" side rails (Item
5) together and place between the two 4” x 4” x 20”
corner posts (Item 1).
Slide the side rails into the corner post slots until the
lock pin holes of the side rails are inside the corner
posts. Install locking pin through the locking pin hole of
the side rails.
Final End And Side Rail Assembly
7
1
5
1
Place one 13" x 5-3/4" x 3/4" corner notched bottom
board (Item 7) on each end of the garden bed.
Corner Notched Bottom Board Assembly
8
7
Place five 13" x 5-3/4" x 3/4" bottom boards (Item 6)
into the garden bed.
(Gap boards evenly to allow for water drainage).
Install the 4” x 4” x 1-1/2” post caps (Item 9) onto the
corner posts.
Place fabric liner (Item 8) into the garden bed.
Bottom Board And Post Cap Assembly
9
6
9
9
9
Completed Assembly
10