Install Instructions

6
English (US)
Multi-zone valve board expansion
Fig. 3 UPZCV multi-zone valve board expansion
See fig. 3.
You can only use the MASTER controller
with PRIORITY.
When priority calls, the MASTER board will
produce 5 VDC between terminals B and C.
This tells the SLAVE board to turn off any
zones that are calling for heat. This also will
close the contacts XX PRIORITY.
When there is a demand for heat, the SLAVE
board will produce 5 VDC between terminals
A and C. This tells the MASTER board to
activate any boiler or secondary pumps and
close the contacts XX MAIN.
You can connect the pump and valve boards.
When the SLAVE board calls for heat, the
secondary pump will be powered. If a boiler
pump and secondary pump are to be used,
connect them to the same terminals.
You can use the low voltage wire to connect
the ABC terminals.
Connect the 120 VAC power supply to each
board.
TM06 5606 5015
C
B
A
C
B
A
Master
Slave
Master
Slave
E
X
P
A
N
S
I
O
N
E
X
P
A
N
S
I
O
N
Master board
Slave board
Caution
CAUTION
Connect the L and N terminals the
same way on each board. If switched,
a differential of 240 VAC can occur
resulting in damage to the equipment.