User Manual

SPRINT User Manual
iDEN 30dBm
16
4.1.3 System set up
1) Once aforementioned process is done, open for service get ready.
2) For grounding, there is a grounding terminal in main power supply side and the grounding
terminal on a site and unit should be connected same.
3) System installation work is basically performed more than two people and should be careful for
unexpected accident.
4.1.4 Open for service
1) Check points before open
a. Verification of system installation status
Electricity, In/out antenna, coaxial cable connection, equipment mounts status.
b. Verification of system accessories
User should check whole necessary accessories.
c. Check receipt signal level
User should check whether receipt environmental condition is in accordance with system specification,
so that system operation will be optimized.
2) Check points after open
a. Check by external LED
RUN: Green light ON (Off: Green light off)
ALARM: Green light in normal status, Red light in alarming
SHUT DOWN: Green light in normal status, Red light in Shutdown
iDEN
Number of LED bar on front side of repeater will show input signal level.
-57dBm -47dBm: LED 1bar
-46dBm~-41dBm: LED 2 bars
-40dBm~-35dBm: LED 3 bars
-34dBm~-29dBm: LED 4 bars
Up than –28dBm: LED 5 bars
Number of LED bar in output power side will show output power signal level.
+5dBm~+9dBm: LED 1bar
+10dBm~+14dBm: LED 2bars
+15dBm~+19dBm: LED 3bars
+208dBm~+24dBm: LED 4bars
Up than
+25dBm: LED 5bars