: WARNING: GT-Lit gt LI VLR Rl ATTACHING AND USING WORK LIGHT Assembly & Installation: GT-PT-54 | 54" Telescoping Tripod for Work Lights TO USE TRIPOD: 1. Begin by loosening Base Star Knob (D) 2. Open Tripod Legs (E) by pulling legs away from center pole until fully extended. 3. Re-tighten Base Star Knob (D) to secure legs in extended position. See Figures 1 and 2. NOTE: It is possible io utilize tripod without fully extending legs, as long as all 3 legs touch the ground.