Installation Instructions

(2) Install outside escutcheon(see Figure H-1, Figure H-2, Figure H-3,
Figure H-4)
NOTE: Cable goes UNDER the boltSee Figure H-2
Cable from outside escutcheon should go though the right
side slot of the mount bracketSee Figure H-4
Install strike on the door
frame, making sure to
allow for the bolt to be
centered in the strike.
As you position the outside
escutcheon, route the cable
through 2-1/8" diameter hole(The
cable must go under the bolt)
Figure G-6
Figure H-1