§3.1.2 Operating procedures
Pre-measurement
Project approval
Program design
Construction design
Surveying and mapping data collection and arrangement
Instrument test, test
Reconnaissance, choice of site, buried stone
Measurement
Operating team stationed in
Satellite status Forecast
Observation planning
Dispatch of operation and field work observation
After the measurement
Data transmission, dump, backup,
Baseline Solution and quality control
Network adjustment (data processing, analysis) and quality control
Finishing results, technical summary
Project acceptance