Product Manual

beamLabs.io 1-800-436-9186 11
0QFO
D
4USVDUVSBM4VQQPSU
"OHMF
*SPO
C
B
MOUNTING POWER HEAD TO CEILING
Look in the box for:
Raise power head and place it on top of step
ladder. Position and align power head with
rail assembly to centerline.
Angle
Iron
Structural Support
Open
WARNING
To prevent SERIOUS INJURY:
DO NOT connect power until instructed.
Install the opener at least 7 feet (2.13m) above the
floor.
Fasten the opener SECURELY to STRUCTURAL
SUPPORT of the garage to prevent falling.
If installing brackets to masonry, concrete anchors
(not provided) MUST be used.
4 x Lag Screw
5/16" x 1-1/2"
4 x Bolt
5/16" - 18 x 1"
4 x Flange Nut Hanging Brackets
(not supplied)
Fasten angle iron to stud
under a finished ceiling.
Raise power head to measure
distance from each side, rail
must be horizontal.
Cut both hanging brackets to
appropriate length. Secure
opener from each side to
hanging brackets with 5/16"
x 1 bolt.
Raise power head and secure
one end of each hanging bracket
to angle iron with 5/16" x 1 bolt.
Open door manually to check
clearance between highest point
of travel of door and rail.
Three most common installation options. Determine the mounting
option that works best for you.
//
5/16
18
x
1
Need rewritten text