Installation Guide

PRE-INSTALL
CHOOSE YOUR
SECURING METHOD
PRE-INSTALL
4
We’ve designed Gutter Guard by Gutterglove
®
with a simple
installation in mind. Manageable sections slide right into place. Then,
either tape them on with the 3M high-bond tape, or screw them on.
Most homes are completed in an afternoon.
SECURING
TAPE IT ON
Clean o front lip of gutter with acetone.
Install in 65º weather or warmer.
Allow 12 hours to cure for full bond.
SCREW IT ON
Use 3 self-tapping screws per section.
Pre- drilling not required.
REMOVE THE GAP THE TROUGH
Front frame of the gutter guard should be
at against the front lip of your gutter.
The trough (see page 2) should be at
least 1/8” below the lip of the gutter. This
adjustment may need to be made on steeply
pitched roofs or gutters that are hung 1 inch
or lower below the rooine.
Push down rmly with your ngers
Front lip
of gutter
Rainwater may run over the front lip of your gutter if these steps are overlooked.
IMPORTANT: DON’T MISS THESE STEPS!
PUSH DOWN FLAT
TO REMOVE GAP.
INCORRECT
7