Data Sheet

GPT-9500 Series User Manual
102
GFCI Warning
Display
GFCI warning message
GR CONT.
Background
For some applications, continuity connection is
required prior to tests. This section allows user
to implement varied methods for continuity test.
Note
Make sure to connect the specific cord between
CONTINUITY terminal and the DUT before
executing test with GR CONT. activation.
As the figure shown below, connect the test lead
(red) one end to the CONTINUITY terminal and
make the red alligator clip on the other end
contacted with the DUT.
CONTINUITY
Terminal