Manual

GDS-2000 Series Training Manual
20
GDS-2000 Demonstration Setup
Follow the below steps to properly power up and connect the demo
board. Use step 5 ~ 8 to reset the board after each demonstration.
1. Power up GDS-2000.
2. Connect the USB cable to the demo board and GDS-2000 rear
panel USB connector.
3. Select x10 as attenuation level, for both CH1 & CH2 probe.
4. Connect the probes between GDS-2000 CH1&2 and the Sine
wave terminal on the demo board.
CH1
CH2
FM Sin
Make sure the ground clips are connected to the ground plane.
5. Press the Save/Recall key F1 to reset the system.
Save/Recall
Default
Setup
F 1