User Manual User Manual

GETTING STARTED
35
Installation
The installation chapter describes how to load the different load
modules, install the optional GPIB card, the rack mount kit and
how to determine each channel number.
Load Module Installation
WARNING
To avoid static electricity, please use appropriate anti-
static work practices.
Module
installation
The PEL-2004 and 2002 can accommodate 4 and 2
load modules, respectively. Module loads can have
1 or 2 channels. Installation of load modules is the
same for both models.
Steps
1. Ensure the PEL mainframe is
turned off from the rear panel.
Disconnect the power cord.
2. Slide the module onto the rails of an empty
load slot.