User Manual User Manual
PEL-2000 Series User Manual
56
Channel Control Connection
Background
The Channel Control connecters are located on the
rear panel of each mainframe. There are two
channel control connectors for each load slot, one
for each channel, if applicable. The channel control
connector is used to externally:
Turn on/off loads.
Supply a reference voltage.
Monitor the load input.
For further details on channel control and the
interface see pages 85, 235.
AWG 24
STRIP GAUGE
10.0 mm
1
CH CONT 1
1
CH CONT 2
1
CH CONT 3
1
CH CONT 4
1
CH CONT 5
1
CH CONT 6
1
CH CONT 7
1
CH CONT 8
SER. NO. LB
2
1
FRAME CONT
GO / NG OUTPUT
GPIB
RS232C
DISCONNECT POWER CORD
BEFORE REPLACING FUSE
50/60 Hz
180 VA MAX
AC
250V
T3.15A
REPLACEFUSE
115V
230V
FUSE RATING
AS SPECIFIED
WARNING
TO AVOID ELECTRIC SHOCK THE POWER C ORD PROTECTIVE
DO NOT REMOVE COVERS. REFER SERVICING TO QUALIFIED PERSONNEL.
250V FUSE OF THE SPECIFIED TYPE AND RATING.
FOR CONTINUED FIRE PROTECTION . REPL ACE FUSE ONL Y WITH
NO OPERATOR SERVICEABLE COMPONENTS INSIDE.
GROUNDING CONDUCTOR MUST BE CONNECTED TO GROUND.
The Channel Control input/output pin layout is shown
below.