Datasheet

D.
OVP, OCP AND UVP FUNCTIONS
current, and duration settings of the sequence. The shortest time
for each step is 50ms and the maximum steps are 1000. The
sequence function is to test DUT's response to the fast changing
power supply that is one of the crucial verification items for
electronic products' reliability tests.
Example for the Sequence Operation
Counting Down From 2hr and 20mins
OVP
(Over Voltage Protection) (Under Voltage Protection)
(Over Current Protection)
UVP
OCP
frequently used voltage and current parameters from the front
panel to quickly save and recall parameters.
PLR-series
PLR-series
PLR-series
PLR-series
E.
PRESET FUNCTION
The PLR-series provides three parameter preset function keys on
the front panel and each preset memory consists of parameters of
output voltage and output current settings. Users via storing
B.
C.
SEQUENCE FUNCTION
OUTPUT OFF TIMER FUNCTION
Before applying the sequence function, a series of different voltage,
current and duration steps must be edited by a PC to make a
sequence. CSV format, through RS-232C, LAN/USB (option) or
GPIB/USB (option) interface, is transmitted to the memory of the
PLR-series to sequentially execute steps consisting of voltage,
The output off timer function is to set the PLR-series to
automatically turn off its output after a certain period of time.
The shortest time setting is 1 minute. The setting range is from
1 minute to the maximum 1000 hours and 59 minutes. This
function can only be activated when power supply output is
being turned on.
When the voltage and current outputs exceed the preset conditions
of OVP and OCP, the PLR-series will be shut down so as to prevent
DUT from any damages.
OCP : the setting range is 5%~110% of the rated output
OVP : the setting range is 10%~110% of the rated output
UVP : the setting range is 1V ~ 110% of the rated output