User manual

OPERATION
83
Note
Ensure load cables have sufficient
current capacity.
Page 39
Series Operation
Series
Configuration
Before using the power supplies in series, the
master and slave units need to be configured.
1. Configure the OVP, OCP and ULV
settings for each unit.
Page 51
2. For each unit, hold the Function key while
turning the power on to enter the power on
configuration settings.
Lock/Local PROT Function Test Set
Output
Unlock ALM_CLR M 1 M 2 M 3
Shift
: Long Push
VSR LAN RMT ERR DLY ALM ISR M 1 M 2 M 3 RUN
C C
A
C V
V
VOLTAGE CURRENT
PSU 40-38
DC Power Supply
0 - 40V / 0 - 38A
Voltage Current
3. Make sure each unit is set to
Independent (F-93 = 0). When
using the power supplies in series,
each unit is operated individually,
and thus no unit is considered the
master or slave.
Page 111
Unit
F-93
Independent
0
4. Cycle the power on the units (reset the power).
Note
Configuration settings can be checked for both the
master and slave units by pressing the Function
key.