User manual
OPERATION
85
5. Connect the master and slave unit in series as
shown above.
6. Reattach the terminal cover.
Page 44
Note
Ensure load cables have sufficient
current capacity.
Page 41
Re-attach the protection dummy plug when not in
use.
Master-Slave Series Operation
Master-Slave
Configuration
Before using the power supplies in series, the
master and slave units need to be configured.
1. Configure the OVP and OCP
settings for the master unit.
Page 57
2. For each unit, hold the Function
key while turning the power on to
enter the power on configuration
settings.
A
W
V
W
%W10080604020
ISR
C C
DLY
ALM
RMT
C V
VSR
Function OVP/OCP Set
Output
PWR DSPLLock/LocalTest
PSW 3 0-36
360W
Voltage
Current
Multi-Range DC Power Supply
3. Configure F-93 (Master/Slave)
setting for each master/slave unit.
Page 114
Unit
F-93
Master (local or series operation)
0
Slave unit (series)
4
4. Cycle the power on the units (reset the power).