Users Manual

Page 27
Installation procedure
Read and understand the preceding contents of this chapter
1. Position the floor template - Place the template in the
desired position on the floor.
Ensure that there is sufficient clearance behind the
machine for cleaning requirements
Before drilling, check and position the template to
ensure that the holes do not affect under floor
heating or other services
2. Drill holes - Place the floor locating bracket in the position
indicated on the template and drill the fixing holes. Ensure
the template is not moved while drilling.
3. Remove template - Take the template away and replace the floor locating bracket.
4. Secure the bracket - Using the desired floor fixing fasteners (not supplied) bolt the floor locating bracket to
the floor. Ensure the floor locating bracket is fitted the correct way round as indicated on the template. The
machine should be rigid with compression on the rubber mounting keeping the machine secure.
5. Position - Lift the rear of the machine centrally over the floor locating bracket. Slide the machine forward on
the runners underneath, until the floor locating bracket locates in the two guide slots in the runners.
6. Secure the machine and connect services:
Replace the mounting base bolt under the motor to secure the machine in position.
Make the waste connection from the internal ‘P’ trap (to mains sewage only). Ensure the connecting
pipe is cut square and deburred before fitting to prevent the waste snagging within the pipework and
restricting the flow.
The cistern overflow indicator pipe discharge should remain visible to indicate an overflow condition. A
tundish device is available as an option to direct overflow water to a drain.
Connect the mains cold water inlet supply. Open the inlet isolating valve.
Connect the flying lead supplied ready fitted to the machine, to the installation isolator. Note advice on
electrical information page.
Turn on the electrical supply. The inlet solenoid valve opens to admit water to the cistern.
Continue with commissioning the machine. Ensure the rotational direction of the machine is correct. A
direction of rotation label with cord tail is attached to the impeller in the hopper. The cord trail must
indicate the trail towards the tick. This is only needed for the three phase machine.
7. Fit front panel - Refit the front panel. Secure with the front panel screw.