Specification Sheet

Printed in the U.S.A.
7120
Two Station Marblyte
Barrier-Free Drinking
Fountain
(CONTINUED)
MOUNTING INSTRUCTIONS
Refer to diagrams for rough-in of plumbing.
Bolt fountain securely to wall per installation
instructions. Water supply and waste line are
to be assembled as required. The final check
for leaks and correct functions of fountain
should be made. (For details see the
installation instructions.)
OPERATING PRESSURES:
Supply water - 105 psi maximum
Important:
For required wall support locations
see installation instructions provided with fountain.
NOTE: A service supply stop (not included)
must be installed at the fountain inlet line.
TOP VIEW
SIDE VIEWWALL LAYOUT
1-1/4" Trap provided.