Specification Sheet
Printed in the U.S.A.
OVL-II
™
SER-GRN-VR
GreenSpec
®
Listed,
High Efficiency,
OVL-II
™
Barrier-Free
Bi-Level Cooler
(CONTINUED)
WALL OPENING
IMPORTANT: It is necessary to create a wall
opening 37
1
/
2" W x 37
3
/4
" H and 4
1
/
2" above
the floor line.
MOUNTING INSTRUCTIONS
Refer to rough-in for location of plumbing and
electrical sources. The support frame is to be
installed first. The shelf for the water chiller
should be assembled to the wall frame, and
then place chiller into position. Hang upper
panel to hanger on frame. Fountains are to be
attached to panel and wall frame. Water service
lines, waste lines and electrical are assembled
as required. The bottom panel is attached last,
after a final check for leaks and correct
functions of fountains and chiller. (For details
see the installation instructions.)
Installation requires trap to be installed in
wall. Trap and service stop not included.
OPERATING PRESSURES:
Supply water - 105 psi maximum
Minimum 40 psi supply line pressure required
in special circumstances where both sides of
bilevel are in use simultaneously to ensure
adequate stream height. Use of water filter in
this situation is not recommended.
ELECTRICAL DATA
Junction box for a (3) wire 10 AMP branch
circuit. Standard 120 volt, 60 HZ, single phase.
FRONT VIEW
TOP & SIDE VIEWS