Specification Sheet

1000001943 (Rev. B - 08/16)
For Technical Service, please contact us at 1.800.476.4106
Elkay - www.elkay.com
Halsey Taylor - www.halseytaylor.com
FRAME
5/16" SCREWS OR BOLTS
(10 REQ'D - NOT FURNISHED)
INSTALL (2) SCREWS
(P/N 111008343890) IN FRAME
BEFORE INSTALLING IN OPENING
18 3/4"
476mm
31 3/4"
806mm
3"
76mm
25"
635mm
MFWSF100 / MFWSF120 MOUNTING FRAME INSTRUCTIONS
1. Cut a square rectangular wall opening 18 3/4” (476mm) W x 31 3/4” (806mm) H and 25” (635mm) above
the oor line. These dimensions are required to obtain proper rim and bubbler heights for compliance with ANSI
standard A117.1.
2. Reinforce the wall opening on all sides so that it will adequately support the water fountain. This reinforcement
must support up to 150 lbs static load and provide a means for securing the frame assembly in place.
3. Install plumbing rough-ins.
4. Remove frame assembly and related hardware from packaging. Install the frame squarely in wall opening with
frame upright edges ush with the nished wall face. Secure the frame to the wall using (10) 5/16” bolts
or screws (not provided). Tighten securely.
NOTE: Be sure that frame is squared in location. Do not use less than required screw quantity and size.
MFWSF120
5/16" SCREWS OR BOLTS
(10 REQ'D - NOT FURNISHED)
(P/N 111008343890 - PROVIDED)
FRAME
MFWSF100
INSTALL (2) SCREWS
(P/N 111008343890 - PROVIDED)
BEFORE INSTALLING IN OPENING

Summary of content (1 pages)