Installation Guide
1
Theinstructionsgivenhereserveasageneralguidelineonhowto installframelesscabinetsin
areasonablysimpleinstallation.Manycabinetdesignsandinstallationsmaybefar more
complexandbeyondthescopeoftheseinstructionsandrequireaprofessionalinstaller.
ToolsRequired
LayoutandPlanningtheInstallation
CabinetInstallationOrder
InstallingCabinetsLevel
FasteningCabinetstotheWall
FasteningCabinetsTogether
InstallingFillers
InstallingTrim
AdjustingHingesandDrawers
Warning:Kitcheninstallationstypicallyinvolvegas,highvoltagewiring,plumbing
andmechanicaldetailslikeheatingandACvents.Thisguideonlycoverscabinet
installation.Ataminimum,ifyou’renotwellversedintheseareasmakesurethat
allpowerisshutofftoexposedwiringandgasvalvesareclosedtogassupplylines.
ToolsRequired
•TapeMeasure•Pencil•3to4footLevel•3/16"DrillBit•PhillipsHeadScrewdriver•#2SquareDriveBit*•Electric
Drill•Hammer•WoodShims•PhillipsHeadScrewGun•Handsaw•ChalkLine•StepLadder•ExtensionCord•Pry
Bar•Clamps
•Carpenter’sSquare•NOTE:If“C”clampsareused,protectmaterialbetweenfinishedcaseofthecabinet
andtheclamp.
Additionaltoolsthatmakethejobeasier:
SmallTablesaw
•PowerMiterSaw•LaserLevel•StudFinder