Installation Guide

1
Theinstructionsgivenhereserveasageneralguidelineonhowto installframelesscabinetsin
areasonablysimpleinstallation.Manycabinetdesignsandinstallationsmaybefar more
complexandbeyondthescopeoftheseinstructionsandrequireaprofessionalinstaller.
ToolsRequired
LayoutandPlanningtheInstallation
CabinetInstallationOrder
InstallingCabinetsLevel
FasteningCabinetstotheWall
FasteningCabinetsTogether
InstallingFillers
InstallingTrim
AdjustingHingesandDrawers
Warning:Kitcheninstallationstypicallyinvolvegas,highvoltagewiring,plumbing
andmechanicaldetailslikeheatingandACvents.Thisguideonlycoverscabinet
installation.Ataminimum,ifyou’renotwellversedintheseareasmakesurethat
allpowerisshutofftoexposedwiringandgasvalvesareclosedtogassupplylines.
ToolsRequired
TapeMeasurePencil3to4footLevel3/16"DrillBitPhillipsHeadScrewdriver•#2SquareDriveBit*•Electric
DrillHammerWoodShimsPhillipsHeadScrewGunHandsawChalkLineStepLadderExtensionCordPry
BarClamps
Carpenter’sSquareNOTE:If“C”clampsareused,protectmaterialbetweenfinishedcaseofthecabinet
andtheclamp.
Additionaltoolsthatmakethejobeasier:
SmallTablesaw
PowerMiterSawLaserLevelStudFinder