Use and Care Manual

Fixings Supplied
Before You Start
Check the contents of the box and make sure you have all the parts and fittings
listed. If not, contact the Factory by email: info@uigroup.ie
or the Helpline (001) 678 534 2876
When you are ready to start, make sure that you have the right tools at hand,
plenty of space and a clean dry area for assembly.
Assembly
Please lay out all nuts and bolts and check lengths before assembly
. It is
recommended that the carton is cut open and spread out on the floor and used as
a protective surface during assembly. Refer to the assembly diagrams as
necessary.
Important - while every precaution has been made in the manufacture of this
product, care must be taken during assembly in case sharp edges are present.
Page 2
Ref Description illustration Qty Ref Description illustration Qty
A
M8 x 10 Bolt
3 D
M6 Nut
44
B
M8 Large
Washer
Stainless Steel
3 E
M6 Washer
11
C
M6x14 Bolt
12 F
M6x10 Bolt
11
G
M6x12 Dome
Head Bolt
32