Installation Guide

30
GENERAL INFORMATION INSTALLATION REQUIREMENTSPRE-INSTALLATION INSTALLATION
Transfer the location of the supply and drain lines to the back or bottom of the cabinet.
Using a hole saw, cut openings 1/4" larger than that of the pipe at these locations.
Follow the Attachment Minimum Requirements section found earlier.
15
VANITY SINK CABINETS
Measure the length of the Toekick area and cut the toekick cover to that length.
Clean the area of any debris. Apply glue to the back of the toekick cover and place
ontotheToekickarea.Usesmallnishingnailstotackthetoekickcoverinplace.
16
TOEKICK COVERS