Installation Guide

21
Follow the Attachment to Wall requirement to attach the face frame to the ceiling joists,
transferring ceiling joist and wall stud locations to the face frame(s) and cabinet back and
pre-drilling clearance holes. Tack shims to the ceiling for alignment.
GENERAL INFORMATION INSTALLATION REQUIREMENTSPRE-INSTALLATION INSTALLATION
8
ATTACHMENT TO CEILING
WARNING: Make sure that the 3-1/2" screws enter 1-1/2" of solid
ceiling or soft framing material. Failure to do so could result in the
cabinet falling off the wall, causing possible injury and damage to the
cabinet that will not be covered by the product warranty.
Holes drilled in face frames must be no more than 2" from vertical
sides of cabinet. Failure to do so could result in the cabinet falling off
the wall, causing possible injury and damage to the cabinet that will
not be covered by the product warranty.
Transfer framing or joist locations
and drill 7/32" clearance holes.